Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Technology›VIDEO: Pontis Introduces 75m Wind Turbine Rotor Blade
Technology

February 4, 2013 · about 13 years ago

VIDEO: Pontis Introduces 75m Wind Turbine Rotor Blade

Pontis introduced its 75m wind turbine rotor blade to the market, named after engineer Edgar Suselbeek’s newborn son Tygo. This IEC Class l rotor blade design is geared toward the 6MW class offshore wind turbines. With this next generational rotor blade, our wind energy portfolio now ranges from 37m

1 minutes read
  • LinkedIn
  • X
  • Email

Pontis introduced its 75m wind turbine rotor blade to the market, named after engineer Edgar Suselbeek’s newborn son Tygo. This IEC Class l rotor blade design is geared toward the 6MW class offshore wind turbines.

With this next generational rotor blade, our wind energy portfolio now ranges from 37m through 75m rotor blades. For TYGO we use conventional reinforcement, core, and resin materials to ensure a lightweight and cost-effective design. This IEC Class I blade is offered with a high modulus glass spar cap option, and conventional E-glass and carbon spar options are also available. Naturally we customize TYGO to fit your turbine specifications in terms of speed, power ratings etc.

TYGO is the latest design of Pontis’ four man strong in-house design and analysis team. They are dedicatedly working on intelligent structural designs, fundamental to optimizing composite solutions in terms of cost-of-energy and ease of manufacturing. For example: infusion time of the TYGO blade shell is one hour thanks to an optimized infusion strategy.

You can watch the simulation below: [mappress]

Press release, February 04, 2013; Image: pontis-engineering

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Technology

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Subsea Micropiles to Invest GBP 5 Million in Expanding Manufacturing, Offshore Ops at Scottish Port
  2. 2SSE Picks Montrose Port as O&M Base for 1.4 GW Offshore Wind Farm
  3. 3Chinese Offshore Wind Foundation Supplier Expanding Into Installation with Ulstein-Designed Vessel
  4. 4European Partners Team Up with Net Zero Atlantic on Canada's Offshore Wind Readiness

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free