VIDEO: Installation of Pelamis Wave Machine

Technology

VIDEO: Installation of Pelamis Wave Machine

Pelamis Wave Power developed a unique system for quickly and safely installing and removing the machine from its anchoring system and electrical connection. The following video demonstrates a typical installation process, with this system that allows the machine to be connected to its mooring and electrical system in around 90 minutes and disconnected in less than 15 minutes:

[mappress]

Offshore WIND Staff, February 15, 2013; Image: Pelamis