Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›UK: Alstom’s Tidal Turbine Reaches Full Potential
News

July 31, 2013 · about 13 years ago

UK: Alstom’s Tidal Turbine Reaches Full Potential

From its immersion in January 2013, at the European Marine Energy Centre (EMEC) in Orkney, Scotland, Alstom’s full-scale tidal device has reached the full nominal power of 1MW after a series of gradual increases in power. The turbine connected to the grid has now generated over 10MWh of electricity,

2 minutes read
  • LinkedIn
  • X
  • Email

From its immersion in January 2013, at the European Marine Energy Centre (EMEC) in Orkney, Scotland, Alstom’s full-scale tidal device has reached the full nominal power of 1MW after a series of gradual increases in power.

The turbine connected to the grid has now generated over 10MWh of electricity, in actual operating conditions. Both are major milestones in the development of the tidal stream energy.

The tidal turbine has been tested in different operational conditions through the ReDAPT1 testing program. It has shown a reliability and performance in line with its design models. The next step of the testing program will be to demonstrate the full range of autonomous running capabilities of the turbine (its ability to efficiently operate independently), continue with the planned maintenance and gather evidence for certification. The endurance and reliability will also be tested into 2014. Tests in pilot farms will follow prior to the start of full commercial production.

“We are enthusiastic following the initial tests of our tidal stream turbine which successfully demonstrated the advantages of Alstom tidal turbine technology, in the challenging environment of the Fall of Warness in Orkney” , stated Alstom Ocean business Vice-President Rob Stevenson.

Alstom’s tidal turbine has a 22 metres long nacelle and weighs 150 tonnes. Its rotor has three pitchable blades and a diameter of 18 meters. The tidal turbine is capable of floating. Buoyancy enables the turbine nacelle to be easily towed to and from the point of operation and attached to its pre-installed foundation. Avoiding the need for specialist vessels and divers, this particular technical feature minimises installation and maintenance costs and reduces the timeframe to install or retrieve the turbine. The unit operates fully submerged with no surface piercing part, in a water depth of about 40 meters. The nacelle can rotate around vertical axis to face the incoming tide at an optimal angle, and thus extract the maximum energy potential.

[mappress]

Press release, July 31, 2013; Image: alstom

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free