Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Authorities›Deepwater Wind Modifies Block Island Wind Farm Proposal
Authorities

November 27, 2013 · about 13 years ago

Deepwater Wind Modifies Block Island Wind Farm Proposal

U.S. Army Corps of Engineers, New England District, have announced that the developer of the proposed Block Island Wind Farm is modifying the proposed plans in seeking a permit to construct the offshore wind farm with accompanying transmission system. The company’s plans involve building a 30MW offs

1 minutes read
  • LinkedIn
  • X
  • Email

U.S. Army Corps of Engineers, New England District, have announced that the developer of the proposed Block Island Wind Farm is modifying the proposed plans in seeking a permit to construct the offshore wind farm with accompanying transmission system.

The company’s plans involve building a 30MW offshore wind farm and power transmission infrastructure off the southeast coast of Block Island, Rhode Island.

U.S. Army Corps of Engineers is now seeking public comments on a proposed project modification. The change consists of an alternative shore landing and buried terrestrial route for the Block Island Transmission System cable on the Rhode Island mainland, referred to as the Scarborough Beach Alternative. The previously proposed Narragansett Town Beach landing alternative has been eliminated from the proposed plan, along with the long-distance horizontal directional drill (HDD) landing construction option for the wind farm’s export cable and transmission system cable on Block Island.

“The Corps is seeking public comments limited to the scope of the activity associated with this modification. All previous comments received regarding the offshore wind farm with its associated submarine interconnecting and transmission cables are part of the Corps’ administrative record and will be evaluated along with any additional comments received in response to this project modification notice,” The Corps said.

[mappress]

Press release, November 27, 2013; Image: Deepwater Wind

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

AuthoritiesGrid ConnectionWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Balfour Beatty Wins Contract for Substation to Connect Three Dogger Bank Wind Farms
  2. 2Archer Weighs Sale of Offshore Wind Business After Culzean Project Setbacks
  3. 3Vattenfall Tests New Bird Monitoring Tech at Dutch Offshore Wind Farm
  4. 4IFM Investors to Acquire Majority Stake in UK Port Operator ABP

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free