Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›First TP Installed at Butendiek Offshore Wind Farm
Wind Farm Update

June 9, 2014 · about 12 years ago

First TP Installed at Butendiek Offshore Wind Farm

The first of a total of 80 transition pieces (TP) at the Butendiek offshore wind farm has been installed. Transition pieces, manufactured by Bladt Industries in Esbjerg, Denmark, are being installed by the DP heavy-lift vessel Jumbo Javelin from Jumbo Shipping. Each TP weighs approximately 330 tons,

1 minutes read
  • LinkedIn
  • X
  • Email

The first of a total of 80 transition pieces (TP) at the Butendiek offshore wind farm has been installed.

Transition pieces, manufactured by Bladt Industries in Esbjerg, Denmark, are being installed by the DP heavy-lift vessel Jumbo Javelin from Jumbo Shipping.

Each TP weighs approximately 330 tons, it measures 31m in height and has a diameter of 5.5m. To install such TPs safely, Jumbo has invested in increased lifting height capability by acquiring a 700 ton SWL Fly-Jib.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Wind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Offshore Substations for Gennaker Wind Farm En Route to Baltic Sea (VIDEO)
  2. 2US Wind Gives Up Sparrows Point Site as Offshore Wind Project Faces Delays
  3. 3Dogger Bank B Wind Turbine Installation Passes Halfway Mark
  4. 4GWEC Calls for Government Action to Accelerate Floating Wind Commercialisation

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free