offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Technology›eVision’s HSE Software Implemented on ‘Thialf’
Technology

October 20, 2014 · about 12 years ago

eVision’s HSE Software Implemented on ‘Thialf’

eVision Industry Software has taken the next step in its partnership with Heerema. Today, Permit Vision goes live on the Thialf, the largest crane vessel in the world. Permit Vision allows Thialf management direct insight in and control of frontline operational risk, which is absolutely crucial to s

1 minutes read
  • LinkedIn
  • X
  • Email

eVision Industry Software has taken the next step in its partnership with Heerema. Today, Permit Vision goes live on the Thialf, the largest crane vessel in the world.

Permit Vision allows Thialf management direct insight in and control of frontline operational risk, which is absolutely crucial to such a large installation. The implementation of Permit Vision on this unique ship marks a milestone for eVision and will assist Heerema in achieving maximal operational integrity.

Concluding an extensive two-week Permit Vision training, response on the Thialf has been overwhelmingly positive. Permit Vision empowers staff to work safer, better, and faster, resulting in short and long-term benefits. Dave McDonald, eVision Training & On-Site Support Consultant, says: “The implementation of eVision HSE software on board is seen as a welcome enhancement by all concerned. Deploying our Permit to Work software on the Thialf brings Heerema another big step closer to achieving Operational Excellence.”

The Heerema Thialf is an impressive deep-water construction vessel. It measures two full-size football fields in length by almost 90 meters wide, weighs in at over 136,000 tonnes, and accommodates more than 700 men. This multifunctional ship is used primarily for installation of offshore wind foundations, moorings, and integrated topsides, as well as pipelines and flowlines.

Permit Vision allows Heerema unprecedented oversight of work on the Thialf, while providing improved legislative and best-practice compliance, reduced risk, and increased safety.

[mappress mapid=”14497″]

Press release; Image: Heerema

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

TechnologyVessels

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Young Oysters Deployed on Two North Sea Cable Crossings
  2. 2Pacifico Energy Unveils EUR 860+ Million Investment in Two Offshore Wind Projects in South Korea
  3. 3Fourth Vard-Built CSOV Joins Windward Offshore Fleet
  4. 4ABS to Support Japanese Company’s 18 MW Floating Wind Turbine Pilot in Brazil

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free