offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Rock Dumping Contract Up for Grabs
Grid Connection

November 21, 2014 · about 11 years ago

Rock Dumping Contract Up for Grabs

TenneT is seeking a company for the work on high-voltage subsea cable in German waters. The scope of work consists of rock dumping, remedial and burial work in water depth of up to 40 meters. The height or rock covering layer is required to be in the range of 0.5-1 meter. TenneT will accept bids [&h

1 minutes read
  • LinkedIn
  • X
  • Email

TenneT is seeking a company for the work on high-voltage subsea cable in German waters.

The scope of work consists of rock dumping, remedial and burial work in water depth of up to 40 meters.

The height or rock covering layer is required to be in the range of 0.5-1 meter.

TenneT will accept bids in separate lots for rock laying and cable burial in shallow and deep waters, or in combination.

All interested parties have until mid-December to submit their offer.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TetraSpar Floater Completes Five-Year Testing Campaign Offshore Norway
  2. 2Standardization and Industrialization Could Cut Offshore Wind Costs in North Sea by 28% - Study
  3. 3Industrialisation, Productivity and Global Competition: What's Next for Blade Manufacturing?
  4. 4Massachusetts Invests USD 4.2 Million to Boost Offshore Wind Workforce and Research

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free