Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›First Subsea Hires Jee Manager
News

June 4, 2015 · about 11 years ago

First Subsea Hires Jee Manager

First Subsea has hired Gary Howland to drive Renewables Connectors Business. Prior to joining Jee, Mr Howland was Vice President – Renewables at Trelleborg Offshore developing business in the global renewable energy sector, in particular offshore wind. Drawing on his recent experience in subsea cabl

1 minutes read
  • LinkedIn
  • X
  • Email

First Subsea has hired Gary Howland to drive Renewables Connectors Business.

Prior to joining Jee, Mr Howland was Vice President – Renewables at Trelleborg Offshore developing business in the global renewable energy sector, in particular offshore wind. Drawing on his recent experience in subsea cable engineering consultancy Gary Howland, commented, ”Cable installation is an area where there is scope for new connector technology offering by better engineering, and quicker and safer cable connections. First Subsea’s connectors offer all three.”

First Subsea has developed a range of cable and mooring systems designed to streamline cable installation and mooring of floating wind turbines. The Monopile Interface Connector (MIC) secures the cable’s monopile connection, while the Hang-Off Connector (HOC) holds the pre-terminated cable in position on the hang-off deck ready for connection.

First Subsea managing director John Shaw said: “Gary Howland’s appointment strengthens our sales and technical resource in line with our commitment to set the standard for wind turbine connectors.”

For the deployment of wind farms further offshore at water depths in excess of 80m, where monopiles are considered impractical, First Subsea has developed a top tension mooring line connector. The top tension connector allow the installation contractor to moor and tension a floating turbine’s mooring lines without the need for specialist tensioning equipment, and surface vessels requiring significant capex, that currently restricts the commercialisation of floating offshore wind farms.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Acta Marine Christens CSOV Chartered by Vestas
  2. 2New Owner to Continue Operations at German Offshore Wind Farm Previously Set for Decommissioning
  3. 3All Monopiles In at Nordlicht I Offshore Wind Farm
  4. 4IWS Fleet Orders Four New Skywalker-Class CSOVs for EUR 260 Million

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free