VBMS Repairs Defective Cable at Trianel Windpark Borkum Phase 2

Grid Connection

VBMS has completed the repair of an inter-array cable at Trianel Windpark Borkum phase 2.

The scope of work included the removal of the defective cable, and installation, burial, terminations and testing of a replacement cable which was completed in less than 48 hours, from arrival to departure. The works were executed in the German Bight by cable-laying vessel Stemat Spirit.

VBMS CEO Arno van Poppel said: “We are very pleased that besides installation projects, we are partnering with more and more clients on repair projects. With this cable repair contract, both Trianel and the insurance companies have shown their confidence in VBMS as a total solutions provider.”

Image: vbms