offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Furukawa Hired on Japan’s Offshore Grid Development
Grid Connection

July 23, 2015 · about 11 years ago

Furukawa Hired on Japan’s Offshore Grid Development

Furukawa Electric Co., Ltd. has been selected as an intended outsource company for the “Next-Generation Offshore DC Power Transmission System Development Project” run by the New Energy and Industrial Technology Development Organization (NEDO). The development of the project will start this year and

1 minutes read
  • LinkedIn
  • X
  • Email

Furukawa Electric Co., Ltd. has been selected as an intended outsource company for the “Next-Generation Offshore DC Power Transmission System Development Project” run by the New Energy and Industrial Technology Development Organization (NEDO).

The development of the project will start this year and run for five years, with the goal of establishing fundamental technologies toward expanding interconnectivity and accelerating the implementation of offshore wind power.

The project was proposed by a consortium of companies led by Tokyo Electric Power Company, Incorporated. Furukawa Electric and VISCAS Corporation will be responsible for developing elemental technologies for subsea DC cable systems.

The offshore transmission project is based on multiterminal functionality, meaning that new onshore transformer substations do not need to be built.

The power, generated from multiple wind farms installed in locations that are suitable for wind power generation but are remote from locations with large-scale demand, will be transmited to existing systems with a large number of connections.

Furukawa is also one of the consortium members developing the Fukushima Experimental Offshore Floating Wind Farm Project.

Featured image: GWEC (Illustration)

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1DWT Returns to Riffgat Offshore Wind Farm
  2. 2Formosa 6 Offshore Wind Farm and Star Trade Enter Corporate Power Purchase Agreement
  3. 3TetraSpar Floater Completes Five-Year Testing Campaign Offshore Norway
  4. 4Standardization and Industrialization Could Cut Offshore Wind Costs in North Sea by 28% - Study

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free