Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›Sandbank OSS Installed (Gallery)
News

May 10, 2016 · about 10 years ago

Sandbank OSS Installed (Gallery)

The installation of Sandbank offshore wind farm’s offshore substation has been completed. It took around three hours to lift the topside from the transport ship and place it on the 51 metres high jacket foundation. The positioning and installation of the substation at sea, placed in water depth of 2

1 minutes read
  • LinkedIn
  • X
  • Email

The installation of Sandbank offshore wind farm’s offshore substation has been completed.

It took around three hours to lift the topside from the transport ship and place it on the 51 metres high jacket foundation. The positioning and installation of the substation at sea, placed in water depth of 28 metres, was carried out by the installation vessel Stanislav Yudin.

The 288MW Sandbank offshore wind farm is located 90 kilometres off the coast of Sylt in the German North Sea.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1IFM Investors to Acquire Majority Stake in UK Port Operator ABP
  2. 2TenneT and NKT Jointly Explore Offshore Cable Decommissioning
  3. 3GEOxyz Conducting Seabed Survey at East Anglia Two Offshore Wind Site
  4. 4US Gov’t Seeks New Review of US Wind’s Maryland Project

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free