Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›New Offshore Renewable Plant Optimisation Tool Proposed
Operations & Maintenance

August 24, 2016 · about 10 years ago

New Offshore Renewable Plant Optimisation Tool Proposed

A paper proposing a novel computational tool for the reliability-based assessment of wave, tidal and offshore wind farms was published yesterday in the Journal of Marine Science and Engineering. The paper presents the new tool to identify typical decision problems and to shed light on the complexity

2 minutes read
  • LinkedIn
  • X
  • Email

A paper proposing a novel computational tool for the reliability-based assessment of wave, tidal and offshore wind farms was published yesterday in the Journal of Marine Science and Engineering .

The paper presents the new tool to identify typical decision problems and to shed light on the complexity of optimising a wave power farm. Nevertheless, the tool is exclusively dedicated to marine renewables and adaptable to a range of technologies.

The proposed tool was used to investigate productivity and availability of a wave energy farm during 10 years of operational life. A number of optimization possibilities to improve productivity, namely vessel choice, maintenance regime, failure rate and component redundancy, were then explored in order to assess their effectiveness. The paper quantifies the yield increase and provides a practical approach to evaluate the effectiveness of strategic and operational decision options.

Results, in terms of the variations in productivity and availability of the farm, are analysed and discussed within the paper, with conclusions highlighting the importance of reliability-centred simulations that consider the specific decision parameters throughout the operational life to find suitable solutions that increase the productivity and reduce the running cost for offshore farms.

The computational tool used belongs to the class of Monte Carlo models, which repeatedly perform a non-deterministic calculation in order to obtain the most probable result. The Monte Carlo method coupled with the computational simulation uses a pseudorandom number generator (PRNG) to generate numbers uniformly distributed between zero and one. The implemented tool uses this methodology and the related reliability data to perform the energetic and economic characterization of offshore farms, simulating the failures that limit their availability, and consequently, productivity, the paper reads.

The authors are Giovanni Rinaldi, Philipp R. Thies, and Lars Johanning of College of Engineering, Mathematics and Physical Sciences at the University of Exeter, and Richard Walker from Mojo Maritime.

The work in the paper has been conducted within the multinational Initial Training Network (ITN) OceaNET, funded under the PEOPLE Programme (Marie Curie Actions) of European Union’s FP7, with Mojo Maritime providing access to Mermaid to support, and for integration with, the research.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Operations & MaintenanceR&D

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1New Zealand Opens First Offshore Wind Feasibility Permit Round
  2. 2SSE Taps Seaway7 for Berwick Bank B Foundations, Inter-Array Cables
  3. 3Wood Thilsted Secures New Contract on Outer Dowsing Offshore Wind Farm
  4. 4Vattenfall to Offer 200 MW of Balancing Power from German Offshore Wind Farm

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free