Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Grid Connection›VIDEO: VBMS and Boskalis Getting Busy at Rampion
Grid Connection

December 20, 2016 · about 9 years ago

VIDEO: VBMS and Boskalis Getting Busy at Rampion

In December 2016, VBMS completed the installation of two 16 kilometre-long 150kV HVAC export cables for the Rampion offshore wind farm situated off the coast of Worthing, UK. To overcome some environmental challenges in this very shallow water, VBMS had to extend the pre-installed landfall HDD’s wit

1 minutes read
  • LinkedIn
  • X
  • Email

In December 2016, VBMS completed the installation of two 16 kilometre-long 150kV HVAC export cables for the Rampion offshore wind farm situated off the coast of Worthing, UK.

To overcome some environmental challenges in this very shallow water, VBMS had to extend the pre-installed landfall HDD’s with duct extensions of approximately 480 metres each.

VBMS utilised Boskalis’ backhoe dredger Manu Pekka to dredge the trenches before installing the duct extensions.

In addition, Boskalis dredged three flotation pits per cable routing to allow CLV Stemat Spirit to reach the location of the end of the ducts.

Following the cable pull-in CLV Stemat Spirit jumped from pit to pit during high tides while laying the cable until it reached deeper water where it could safely remain afloat and resume the remaining cable laying operations.

The GBP 1.3 billion Rampion ofshore wind farm is being built by E.ON, the Green Investment Bank plc and Canadian energy company Enbridge.

It will consist of 116 turbines, each with a generating capacity of 3.45 MW. Located 13km off the Sussex coast, between Brighton and Lancing, the wind farm is expected to be completed in 2018.

Video: VBMS/YouTube

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Grid ConnectionVesselsWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fugro Completes 2026 Survey Campaign for Ireland’s 900 MW Offshore Wind Project
  2. 2Nexans Starts Manufacturing 525 kV Subsea Cables for LanWin2 Offshore Wind Grid Connection
  3. 3All Turbines Installed and Generating Power at Taiwan’s 1 GW Offshore Wind Farm
  4. 4Canada Pledges CAD 100 Million to Advance Nova Scotia’s Offshore Wind

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free