offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Vessels›Photo of the Day: First EOWDC Jacket Top Sections Arrive in Newcastle
Vessels

October 5, 2017 · about 9 years ago

Photo of the Day: First EOWDC Jacket Top Sections Arrive in Newcastle

Osprey Construction and Marine Logistics has posted a photo of the Osprey Carrier II barge entering the Tyne, Newcastle, with the first two jacket top sections for the 92.5MW Aberdeen offshore wind farm on 30 September.

1 minutes read
  • LinkedIn
  • X
  • Email

Osprey Construction and Marine Logistics has posted a photo of their Osprey Carrier II barge entering the Tyne, Newcastle, with the first two jacket top sections for the 92.5MW European offshore wind deployment centre (EOWDC) on 30 September.

Mandora Logistics loaded out the first two jacket top sections at Smulders fabrication yard in Hoboken, Belgium, on 29 September.

Boskalis awarded Smulders Project a contract for manufacturing and assembling the suction bucket jacket foundations for the project.

The top sections are being built at Hoboken, while the lower sections are being manufactured in Newcastle, where the final assembly will take place.

The eleven MHI Vestas 8.4MW turbines are scheduled for installation in March 2018.

As Scotland’s largest offshore wind test and demonstration centre, the EOWDC, also called the Aberdeen Offshore Wind Farm, will trial next generation technology and is expected to contribute to driving down the cost of clean power.

The wind farm is expected to generate first power in summer 2018 and operate for 20 years.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1DWT Returns to Riffgat Offshore Wind Farm
  2. 2Formosa 6 Offshore Wind Farm and Star Trade Enter Corporate Power Purchase Agreement
  3. 3TetraSpar Floater Completes Five-Year Testing Campaign Offshore Norway
  4. 4Standardization and Industrialization Could Cut Offshore Wind Costs in North Sea by 28% - Study

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free