Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Vessels›SeaZip Fix Departs for Horns Rev 1
Vessels

May 17, 2018 · about 8 years ago

SeaZip Fix Departs for Horns Rev 1

DP1 Ice Class Survey and ROV vessel SeaZip Fix is currently on its way to the Horns Rev 1 offshore wind farm in the Danish North Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

DP1 Ice Class Survey and ROV vessel SeaZip Fix is currently on its way to the Horns Rev 1 offshore wind farm in the Danish North Sea.

The 42-meter-long vessel will be in charge of providing ROV and survey services at the 160MW offshore wind farm on behalf of North Sea Service (NTSEAS).

According to SeaZip, this is SeaZip Fix’s first assignment since the Dutch company began jointly operating the vessel with Deep Hydrography & Geophysics in mid-April.

Located off Jutland’s southwestern coast at Blåvandshuk, Horns Rev 1 comprises 80 2MW wind turbines which have been operational since 2002.

Vattenfall owns 60% of the offshore wind farm, while Ørsted owns the remaining 40%.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Vessels

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Germany to Auction 4 GW of Offshore Wind Capacity in 2027 Under Revised Site Plan
  2. 2Offshore Substations for Gennaker Wind Farm En Route to Baltic Sea (VIDEO)
  3. 3US Wind Gives Up Sparrows Point Site as Offshore Wind Project Faces Delays
  4. 4Dogger Bank B Wind Turbine Installation Passes Halfway Mark

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free