Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Locally Built CTV for Yunlin OWF Launched
Operations & Maintenance

August 10, 2020 · about 6 years ago

Locally Built CTV for Yunlin OWF Launched

A Taiwan-built crew transfer vessel (CTV) which will operate at the Yunlin offshore wind farm has been completed and launched, according to Deutsche Windtechnik. The CTV, named Prosperous 1 (風盛1號), was ordered by the developer wpd and the service provider Deutsche Windtechnik from Prosperous Wind Sh

1 minutes read
  • LinkedIn
  • X
  • Email
A close-up of Prosperous 1 vessel name on the portside
wpd

A Taiwan-built crew transfer vessel (CTV) which will operate at the Yunlin offshore wind farm has been completed and launched, according to Deutsche Windtechnik.

The CTV, named Prosperous 1 (風盛1號), was ordered by the developer wpd and the service provider Deutsche Windtechnik from Prosperous Wind Shipping, and built by LungTeh shipyard.

“The vessel is the first locally built CTV for Prosperous Wind Shipping in Taiwan and will be used to transport local technicians and materials to Yunlin offshore wind farm” , Deutsche Windtechnik stated.

The Germany-headquartered service provider secured a contract for the Yunlin project with wpd in 2018, and later established a new regional unit in Taiwan.

Under the contract with wpd, Deutsche Windtechnik is in charge of a large part of wind turbine maintenance above and below water, as well as technical management for the Yunlin offshore wind farm.

The offshore wind farm, owned by wpd (73 per cent) and by a Sojitz Corp-led consortium (23 per cent), will feature 80 Siemens Gamesa 8 MW turbines installed some 8 kilometres off the Taiwanese coast.

The project is scheduled to come online in 2021.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Operations & MaintenanceVessels

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Subsea Micropiles to Invest GBP 5 Million in Expanding Manufacturing, Offshore Ops at Scottish Port
  2. 2SSE Picks Montrose Port as O&M Base for 1.4 GW Offshore Wind Farm
  3. 3Chinese Offshore Wind Foundation Supplier Expanding Into Installation with Ulstein-Designed Vessel
  4. 4European Partners Team Up with Net Zero Atlantic on Canada's Offshore Wind Readiness

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free