Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Export Cable In Place at Changle Area C Offshore Wind Site
Grid Connection

May 19, 2021 · about 5 years ago

Export Cable In Place at Changle Area C Offshore Wind Site

SB Submarine Systems’ (SBSS) cable installation barge Fu Yong 6 has completed the installation of the export cable at the Changle Area C offshore wind site in China. Fu Yong 6 carried out the installation of 38.9 kilometers of cable with burial of three meters at the site located off the coast of th

1 minutes read
  • LinkedIn
  • X
  • Email
Export Cable In Place at Changle Area C Offshore Wind Site
SBSS

SB Submarine Systems’ (SBSS) cable installation barge Fu Yong 6 has completed the installation of the export cable at the Changle Area C offshore wind site in China.

Fu Yong 6 carried out the installation of 38.9 kilometers of cable with burial of three meters at the site located off the coast of the Fujian province.

The 258 mm diameter 220 kV power cable was pulled some 1.7 kilometers to the beach manhole over three successive tides, SBSS said.

The Chinese company added that this was its first time to perform the full work scope, including shore and civil operations, cable landing and offshore installation.

The Changle Waihai wind farm will be the first commercial project in the world to feature turbines with an individual rated output of 10 MW or more.

The 300 MW Changle Area A will consist of 40 turbines, 15 of which mounted on suction pile jacket foundations, while the 496 MW Changle Area C will feature 62 turbines all set to be installed on suction pile jackets.

Fu Yong 6 is now under tow to Changshu where it will immediately load for its follow-on assignment.

To remind, SBSS took delivery of the cable installation and maintenance barge in October 2020, shortly after which the barge completed its first 220 kV power cable loading in Jiangsu.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Grid ConnectionWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Balfour Beatty Wins Contract for Substation to Connect Three Dogger Bank Wind Farms
  2. 2Archer Weighs Sale of Offshore Wind Business After Culzean Project Setbacks
  3. 3Vattenfall Tests New Bird Monitoring Tech at Dutch Offshore Wind Farm
  4. 4IFM Investors to Acquire Majority Stake in UK Port Operator ABP

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free