588 results found for 'Dudgeon offshore wind farm'

588 results found for 'Dudgeon offshore wind farm'
Order results by

A list of search results

  • 26 July 2024
    Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    More than a quarter of wind turbines at Dogger Bank A, the first phase of the UK’s 3.6 GW Dogger Bank Wind Farm, have been installed. So far, 27 of the 95 GE Haliade-X 13 MW wind turbines that Dogger Bank A will comprise are in place, according to information in Equinor’s results for the […]

  • 18 April 2024
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The UK Secretary of State for the Department of Energy Security and Net Zero has granted development consent to Equinor’s Sheringham Shoal and Dudgeon Extension Projects off the North Norfolk coast. The projects are extensions to the operational Sheringham Shoal and Dudgeon Offshore Wind Farms, which currently power around 710,000 UK homes. The consent enables […]

  • 1 August 2024
    Business & Finance, Business development, Contribution, Industry, Jobs & Recruitment, Supply Chain

    This is an op-ed piece by Sam Salustro, Vice President of Strategic Communication at Oceantic Network, the US offshore renewable energy industry organisation.  Six months occupied with questions about the upcoming election have muddied the waters, shifting the conversation about offshore wind energy away from the real groundwork being laid and progress already underway in […]

  • 23 February 2024
    Business & Finance, Fixed-Bottom, Planning & Permitting

    ScottishPower Renewables, Iberdrola’s company in the UK, is getting the East Anglia One North and East Anglia Two offshore wind projects ready for the upcoming auction round for Contracts for Difference (CfD). This is according to project updates Iberdrola published as part of its financial results for 2023. Iberdrola says “good progress is being made […]

  • 5 April 2016
    Wind Farm Update

    The crane vessel Oleg Strashnov has installed the first monopile at the Dudgeon offshore wind farm, located off Norfolk, England. “Our team and suppliers have worked hard to prepare for the exciting installation phase and we are pleased to progress according to plan,” said Olav-Bernt Haga, project director for the Dudgeon project. In total, 67 turbines, as well […]

  • 22 November 2017
    Wind Farm Update

    Statoil, Masdar and Statkraft officially opened the 402MW Dudgeon offshore wind farm in Great Yarmouth, UK, on Wednesday, 22 November.

  • 17 October 2014
    Vessels, Wind Farm Update

    From autumn 2016, A2SEA will play a key role in helping build the 402MW Dudgeon Offshore Wind Farm in the UK for Statoil, Masdar and Statkraft. A2SEA will provide their specialist purpose-built offshore installation vessel SEA INSTALLER to install the 67 Siemens 6MW turbines. Dudgeon Offshore Wind Farm is located off the coast of the seaside town […]

  • 29 August 2017
    Vessels, Wind Farm Update

    A2SEA’s wind turbine installation vessel Sea Challenger has loaded the final set of wind turbine components for the 402MW Dudgeon offshore wind farm project at the Port of Hull.

  • 5 January 2017
    Vessels, Wind Farm Update

    A2SEA’s wind farm installation vessel Sea Challenger is preparing to sail out of the port of Hull with the first load of turbine components to be installed at the 402MW Dudgeon offshore wind farm. Sea Challenger was loaded with components of four Siemens 6MW turbines on Wednesday, 4 January. The vessel will make 17 runs […]

  • 3 March 2021
    Contracts & Tenders, Vessels

    Equinor has extended a contract with Esvagt for its Esvagt Njord Service Operation Vessel (SOV) at the Dudgeon offshore wind farm. The five-year contract extension will see the vessel resuming its deployment at the 402 MW wind farm off Norfolk in the UK until 2026, which will bring Esvagt Njord to being in service on the […]

  • 23 December 2013
    Authorities, Business & Finance, Wind Farm Update

    In order to ensure that the UK remains on track to meet its renewable energy obligation targets by 2020, the Department for Energy and Climate Change (DECC) has announced that it has chosen sixteen renewable energy generation projects which are ‘provisionally affordable’ in the Final Investment Decision Enabling for Renewables (FIDeR) process. The Dudgeon Offshore […]

  • 19 December 2014
    Business & Finance, Operations & Maintenance, Vessels, Wind Farm Update

    Dudgeon Offshore Wind Limited has awarded a 5 year contract for the Service Operation Vessel to Esvagt AS.  The contracted Service Operation Vessel (SOV) for Dudgeon wind farm is of the Havyard-832 design with a length of 83.7 meters and a width of 17.6 meters. The SOV is a DP-2 Class operated vessel, accommodating 60 persons […]

  • 17 December 2015
    Business & Finance, Wind Farm Update

    The development of the Dudgeon Offshore Wind Farm is progressing as planned and the project is not affected by Statkraft’s announcement of reduced investment plans in offshore wind, according to Dudgeon Offshore Wind Limited. Full production is expected in late 2017 as previously announced, the developer said. As Offshore WIND reported yesterday, Norway’s Statkraft released an adjusted investment […]

  • 17 June 2016
    Wind Farm Update

    On Wednesday, the last three transition pieces for the Dudgeon offshore wind farm left Smulders’ yard in Hoboken. Smulders and Sif have been in charge of the production of the 67 transition pieces for the project, developed by Statoil, which owns the wind farm together with Statkraft and Masdar. “These TP’s were the heaviest and largest ones produced by Smulders […]

  • 9 February 2017
    Grid Connection, Wind Farm Update

    Up to 6,000 homes in UK are now receiving electricity from the first producing wind turbine on the 402MW Dudgeon offshore wind farm, Statoil reports.

  • 5 September 2017
    Vessels, Wind Farm Update

    A2SEA’s wind turbine installation vessel Sea Challenger has installed the last of the 67 Siemens 6MW wind turbines on the 402MW Dudgeon offshore wind farm.

  • 27 April 2015
    Business & Finance

    Sembmarine SLP has awarded a contract to Manchester-based Granada Material Handling Ltd (GMH) to manufacture, deliver and commission two davit crane units for Siemens’ Transmission and Distribution Platform at the Dudgeon offshore wind farm. Each of the Granada ‘Python’ crane units have been specifically designed for the Dudgeon offshore wind farm and the challenging marine environment […]

  • 4 July 2014

    The Dudgeon Wind Farm Limited has awarded the contract for the Monopile Foundation Fabrication for its Dudgeon Offshore Wind Farm to Sif Group B.V. The contract covers the procurement, fabrication and assembly of 67 monopiles (MPs) and 67 transition pieces (TPs), including transportation to the Dudgeon Offshore Wind Farm storage site from where the monopile […]

  • 26 January 2017
    Vessels, Wind Farm Update

    A2SEA’s wind farm installation vessel Sea Challenger has installed the first four Siemens 6MW turbines at the 402MW Dudgeon offshore wind farm located some 32 kilometres off North Norfolk,UK.  Sea Challenger has already picked up the second four-turbine batch from the load out port in Hull and is en route to the installation site, A2SEA told […]

  • 17 October 2012
    Wind Farm Update

    Statoil and Statkraft have acquired the Dudgeon Offshore Wind Farm project through the acquisition of all shares in Dudgeon Offshore Wind Limited (DOW), a subsidiary of the UK energy company Warwick Energy Limited.  Following a successful partnership in developing the Sheringham Shoal Offshore Wind Farm off the coast of North Norfolk, Statoil and Statkraft will […]

  • 9 January 2017
    Vessels, Wind Farm Update

    A2SEA’s wind farm installation vessel Sea Challenger has installed the first turbine on the 402MW Dudgeon offshore wind farm situated some 32 kilometres off North Norfolk, UK. The first out of the 67 Siemens 6MW turbines was installed on Saturday, 7 January. For the next months, the vessel will install the turbines being shipped from […]

  • 27 December 2013
    Authorities

    The UK Department of Energy and Climate Change (DECC) has approved Dudgeon Offshore Wind’s application to vary the offshore planning consent. Namely, after the acquisition of the Dudgeon Offshore Wind Farm by Statoil and Statkraft the variations were requested due to the structure of the seabed. The review also indicates that in order to avoid […]

  • 1 July 2014
    Wind Farm Update

    Statoil and Statkraft have decided to start building the Dudgeon offshore wind farm off the coast of Norfolk, UK. The project aims for full production in late 2017. When completed, Dudgeon will provide renewable energy for up to 410,000 households in the UK. The Dudgeon development will now move into a new phase, starting with […]

  • 11 December 2014

    Attended by close to 150 companies, the supplier day organised by Statoil with GROW: Offshore Wind, highlighted supply chain opportunities emerging from the Dudgeon offshore wind farm. The event held at Great Yarmouth Town Hall, aimed to encourage Tier 2 offshore wind supply chain companies to tender for the products and services required by the […]

  • 3 July 2014
    Grid Connection

    VSMC has been awarded a EUR 110 million contract by Dudgeon Offshore Wind Limited, owned by Norwegian companies Statoil and Statkraft, for the export and inter-array cabling for the Dudgeon Offshore Wind Farm. VSMC will start in 2015 by performing two 1,100-metre horizontal directional drillings at the landfall, followed by the installation of two 42-km […]

  • 11 May 2012
    Grid Connection

    Dudgeon Offshore Wind Limited (DOW), a subsidiary of Warwick Energy Limited, has selected ABB Limited (ABB) as the preferred supplier for the delivery of the electrical works for the Dudgeon Offshore Wind Farm (Dudgeon) project following a competitive tendering exercise. The formal contract for these services in not expected to be signed until 2013, dependent […]