114 results found for 'Maasvlakte 2'

114 results found for 'Maasvlakte 2'
Order results by

A list of search results

  • 31 October 2024
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    ScottishPower Renewables has awarded Sif and Smulders a contract to supply 64 monopile foundation and transition pieces (TPs) for the 960 MW East Anglia Two offshore wind farm in the UK. ScottishPower Renewables, Iberdrola’s UK arm, signed the contracts with Sif Netherlands for supplying 64 monopiles and with a joint venture between Sif and Smulders […]

  • 3 September 2024
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Foundations, Supply Chain

    Sif is in exclusive negotiations for a 140-kilotonne monopile foundation project for an offshore wind farm that was awarded a Contract for Difference (CfD) in the UK’s Allocation Round 6 (AR6), the Dutch company informed following the announcement of the AR6 results. “It is expected that a final contract will be reached before the end […]

  • 10 July 2024
    Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    Dutch offshore wind foundation manufacturer, Sif, will be using a new welding technique in the production process of XXXL monopiles in its new production halls on the Maasvlakte, Rotterdam. The Cold Wire Tandem-Twin Narrow Gap SAW (CWTT-NGSAW) process is said to make welded joints stronger and welded connections more durable. The method was developed by Sif’s […]

  • 12 November 2024
    Business & Finance, Fixed-Bottom, Supply Chain, Wind Turbines

    ScottishPower has awarded Siemens Gamesa a turbine contract worth more than GBP 1 billion for its 960 MW East Anglia Two offshore wind farm in the UK. Under the contract, Siemens Gamesa will supply 64 of its flagship SG 14-236 DD wind turbines, which have a rotor diameter of 236 metres, for ScottishPower’s third offshore […]

  • 12 September 2024
    Grid Connection, Offshore Platforms

    A consortium of GE Vernova and Seatrium has held a steel-cutting ceremony to mark the start of construction work on TenneT’s IJmuiden Ver Beta offshore converter platform, one of the first Dutch 2 GW grid connection projects. The first steel was cut at Seatrium’s Tuas Boulevard shipyard in Singapore. The high voltage direct current (HVDC) […]

  • 28 June 2024
    Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    Sif Group is planning to commence the production of monopile foundations for the Empire Wind 1 offshore wind project next month at its Maasvlakte site in the Netherlands. The first steel plates for the 810 Empire Wind 1 wind farm have been delivered at Sif’s Maasvlakte site, and the first transition piece (TP) is currently […]

  • 22 August 2024
    Contracts & Tenders, Grid Connection, Offshore Platforms, Supply Chain

    TenneT has closed the tender and awarded contracts to companies that will provide HVDC engineering support to the already-selected EPCI contractors for the 2 GW bipolar HVDC converter stations that will make the new offshore grid connections in the Netherlands.  Dutch transmission system operator (TSO) signed the contracts, valued at a total of EUR 7 […]

  • 17 October 2024
    Business development, Equipment, Project Updates, Technology

    Rotterdam, Netherlands – October 2024 – Davi, a leader in the production of innovative rolling technology, is proud to announce the successful final acceptance of their Plate Rolls by the Dutch client, Sif, at their newly built complex in Maasvlakte Rotterdam. This area, notable for being an artificially created strip of land, is so innovative […]

  • 12 June 2024
    Fixed-Bottom, Green Hydrogen, Power-to-X, Project Updates, Wind Farm Update

    The joint venture between Vattenfall and Copenhagen Infrastructure Partners (CIP), which has been awarded the 2 GW IJmuiden Ver Beta offshore wind area in the Netherlands, will also build a floating solar farm within the offshore project site and install a large-scale electrolyser in the Port of Rotterdam to use the electricity generated at IJmuiden […]

  • 15 March 2024
    Business & Finance, Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    The first production line at the new manufacturing halls Sif is building at its Maasvlakte 2 site in Rotterdam is scheduled to go into operation in July 2024, according to the Dutch manufacturer, which is building the new halls as an extension to its existing facilities.  Sif made the final investment decision (FID) to build […]

  • 11 January 2024
    Collaboration, Outlook & Strategy

    The Dutch offshore wind foundation manufacturer, Sif, and its compatriot Ballast Nedam have signed a memorandum of understanding (MoU) as part of the process of developing a joint venture that specialises in the decommissioning of obsolete and aged offshore wind farms. Named BNS Decom, the joint venture intends to serve as the ultimate, turnkey solution provider for asset owners, […]

  • 4 January 2024
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Foundations, Manufacturing, Planning & Permitting, Project Updates, Supply Chain, Wind Farm Update

    The Dutch offshore wind foundation manufacturer, Sif, has received a notice of termination of its Empire Wind 2 monopile contract from the joint venture owned by BP and Equinor, who have just terminated their Offshore Wind Renewable Energy Certificate (OREC) agreement for the 1,260 MW project with the New York State. Sif was contracted to […]

  • 23 July 2018
    Environment, Ports & Logistics, R&D, Technology

    At Maasvlakte 2 in the Port of Rotterdam, Fistuca is currently testing the BLUE Piling technology for driving the foundation piles of offshore wind turbines into the seabed. 

  • 3 November 2017

    The PUMA consortium has completed the first phase of land reclamation works at the site of the Rotterdam Offshore Center Maasvlakte 2 in the Port of Rotterdam.

  • 11 July 2017
    Business & Finance, Operations & Maintenance, Vessels

    The Port of Rotterdam Authority and PUMA, a joint venture between Royal Boskalis Westminster NV and Van Oord NV, signed a contract for the construction of the the Rotterdam Offshore Center Maasvlakte 2.

  • 27 August 2019
    Ports & Logistics, Wind Farm Update

    Sif Holding has entered into an agreement with DEME Offshore to use Maasvlakte 2 in the Netherlands for marshaling services for the Borssele 1 & 2 offshore wind project. The deal comes as Sif agreed with the Port of Rotterdam on the lease of an additional 20ha of industrial land, adjacent to the company’s existing operations at […]

  • 28 July 2016
    Business & Finance, Vessels

    SIF Group and BOW Terminal Vlissingen have signed an agreement to renew their cooperation which will now cover Sif Group’s new terminal at Maasvlakte 2 in the Port of Rotterdam. The new agreement includes work on the coordination and implementation of both horizontal and vertical transport for all SIF Group projects at the new terminal. Back in June […]

  • 28 August 2019
    Ports & Logistics

    Dutch offshore foundations manufacturer Sif has completed the new coating facilities at Maasvlakte 2 in the Port of Rotterdam. Sif added the two extra coating halls in response to stricter requirements for coating as the wind farms are venturing into deeper waters in an effort to lower the costs and generate more energy. The new coating facilities […]

  • 23 November 2017
    Ports & Logistics, R&D, Wind Farm Update

    Sif has started the production of monopile foundations and has produced half of the primary steel for the transition pieces (TPs) to be installed on the 370MW Norther offshore wind farm located in the Belgian North Sea.

  • 2 June 2017
    Business & Finance, Operations & Maintenance, Ports & Logistics, Vessels

    The Port of Rotterdam has taken the decision to create space for an offshore center for wind energy at sea – the Rotterdam Offshore Center Maasvlakte 2.

  • 30 June 2015
    Business & Finance

    Roermond-based Sif Group has decided to expand its production capacity with more than EUR 60 million to be invested in the headquarters in Roermond and in Rotterdam at Maasvlakte 2.  In Rotterdam, an assembly hall and a coating hall will be built at Maasvlakte 2. In addition, a storage and logistical hub covering approximately 40 hectares […]

  • 8 April 2020
    R&D, Technology

    Dutch offshore foundations manufacturer Sif has upended the slip joint transition piece built for the Borssele V innovation site at its facility on Maasvlakte 2 in the Port of Rotterdam. The slip joint monopile is in the company’s storage area at Maasvlakte 2. The slip joint monopile foundation will support one of the two MHI […]

  • 24 August 2017
    Business & Finance

    Dutch foundation components manufacturer Sif Holding NV has put into operation the second production line at the company’s assembly facility at Maasvlakte 2, Rotterdam, bringing the plant to full capacity. With the opening of the second production line this month, the company expects the capacity for XL monopiles to increase and reach a maximum capacity of […]

  • 24 March 2017
    Wind Farm Update

    The last four transition pieces (TPs) for the Galloper offshore wind farm in the UK have been dispatched from Smulders facilities in Hoboken, Belgium, and are on their way to Rotterdam, where they will be loaded onto the installation vessel Innovation at Sif’s Maasvlakte 2 site.

  • 17 July 2019
    Grid Connection, Technology

    Visser & Smit Hanab has completed the cable connection which will link the prototype Haliade-X 12 MW wind turbine at Maasvlakte 2 in the Port of Rotterdam to the Stedin high-voltage station. The 1.5-kilometre, 66kV connection was tested on 16 and 17 July, after which it was put into operation, Visser & Smit Hanab said. GE Renewable […]

  • 3 February 2022
    Wind Farm Update

    The Netherlands-based foundation manufacturer Sif Group has completed the first several monopiles for the world’s largest offshore wind farm under construction – the 3.6 GW Dogger Bank in the UK. Sif manufactured the monopiles at its factory on Maasvlakte 2 in the Port of Rotterdam. The monopiles produced will be installed on the 1.2 GW […]