215 results found for 'borssele 1'

215 results found for 'borssele 1'
Order results by

A list of search results

  • 7 August 2024
    Fixed-Bottom, Operations & Maintenance, Project Updates, Technology, Wind Farm Update

    Ørsted has deployed heavy-lift cargo drones (HLCDs) for maintenance work at the Borssele 1&2 offshore wind farm in the Netherlands. This is the first time heavy-lift cargo drones are being used in an operational campaign, according to the company which tested the concept in 2023 at its Hornsea One offshore wind farm in the UK. […]

  • 22 August 2024
    Contracts & Tenders, Grid Connection, Offshore Platforms, Supply Chain

    TenneT has closed the tender and awarded contracts to companies that will provide HVDC engineering support to the already-selected EPCI contractors for the 2 GW bipolar HVDC converter stations that will make the new offshore grid connections in the Netherlands.  Dutch transmission system operator (TSO) signed the contracts, valued at a total of EUR 7 […]

  • 12 January 2024
    Business development, Environment, Fixed-Bottom, R&D, Research & Development

    Ørsted and Van Oord, through their Ocean Health initiative, will install innovative droppable oyster structures at the 752 MW Borssele 1&2 offshore wind farm in the Netherlands to introduce European flat oysters and improve biodiversity in the wind farm. The new installation method will allow affordable and manual deployment of oyster broodstock, according to Ørsted. […]

  • 29 April 2020
    Wind Farm Update

    Ørsted’s Borssele 1 & 2 offshore wind farm has delivered first power to the Dutch grid. According to the Danish company, the first Siemens Gamesa 8 MW turbine began producing electricity on 28 April. “This is a big milestone for Borssele 1 & 2. Ørsted is doing its utmost to allow the construction of the […]

  • 6 July 2017
    Business & Finance, Operations & Maintenance, Technology, Wind Farm Update

    Siemens Gamesa and DONG Energy have signed an agreement for the supply and maintenance of 94 8MW turbines at the 752MW Borssele 1 and 2 offshore wind farms being developed in Dutch waters.

  • 28 May 2019
    Wind Farm Update

    EEW Offshore Structures Britain has produced the first transition piece for the Borssele 1&2 offshore wind farm in the Dutch North Sea. The Teesside-based company rolled out the first of 35 transition pieces destined for Ørsted’s Borssele 1&2 project at the beginning of April. EEW SPC, the parent company of EEW OSB, is in charge of manufacturing 47 monopiles […]

  • 25 August 2020
    Vessels, Wind Farm Update

    Sea Challenger has left the port of Esbjerg with one of the last batches of turbines for the Borssele 1 & 2 offshore wind farm. DEME’s vessel is working in tandem with its sister vessel Sea Installer on the installation of 94 Siemens Gamesa 8 MW turbines at the site in the Dutch part of […]

  • 6 September 2021
    Wind Farm Update

    Ørsted is set to officially open the Borssele 1 & 2 offshore wind farm today (6 September), after postponing the project’s inauguration a number of times due to COVID-19. The developer of the 752 MW offshore wind farm in the Netherlands, which has been operational since the fourth quarter of 2020, will also celebrate the […]

  • 7 April 2021
    Business & Finance, Wind Farm Update

    Ørsted has signed an agreement with Norges Bank Investment Management (NBIM) to divest a 50% ownership share in its Borssele 1 & 2 offshore wind farm in the Netherlands. As part of the deal, Ørsted will continue to provide long-term operations and maintenance services from its O&M base at the Port of Vlissingen, as well as provide […]

  • 30 May 2018
    Grid Connection, Wind Farm Update

    Work on the jacket foundation for the 700MW Borssele Alpha offshore transformer station is in full swing at HSM Offshore’s yard in Schiedam, the Netherlands, as this photo shared by Ørsted shows.

  • 3 December 2019
    Wind Farm Update

    SAL Heavy Lift’s multi-purpose cargo ship Svenja has arrived at the Redcar Bulk Terminal, the UK, to pick up the third batch of transition pieces for the Borssele 1+2 offshore wind project. Svenja is picking up six transition pieces, which were produced by EEW Offshore Structures Britain (OSB) and barged down to the Redcar terminal […]

  • 16 October 2018
    Contracts & Tenders, Grid Connection, Vessels, Wind Farm Update

    Van Oord has won a contract to install inter-array cables on Ørsted’s Borssele 1 + 2 offshore wind farm in the Dutch North Sea.

  • 2 November 2018
    Contracts & Tenders, Jobs & Recruitment, Wind Farm Update

    Ørsted has selected ERSG to supply temporary specialist staff for the Borssele 1+2 offshore wind project in the Dutch North Sea.

  • 29 November 2018
    Contracts & Tenders

    Ørsted has awarded Atlas Professionals with a contract to supply personnel for the Borssele 1 & 2 offshore wind farm in the Netherlands.

  • 23 October 2020
    Wind Farm Update

    The 752 MW Borssele 1 and 2 offshore wind farm is nearly fully commissioned with the last of the turbines currently undergoing tests before they start feeding the electricity to the Dutch grid. Once fully commissioned, the 94-turbine wind farm will surpass the 600 MW Gemini to become the largest operating offshore wind farm in […]

  • 27 November 2020
    Wind Farm Update

    Ørsted’s first offshore wind farm in the Netherlands, Borssele 1&2, has been fully commissioned. Located 22 kilometres off the coast of the province of Zeeland, the 752 MW project has now become the largest offshore wind farm in the Netherlands and the second-largest operating offshore wind farm in the world, providing enough green electricity to […]

  • 14 May 2018
    Vessels, Wind Farm Update

    Bibby HydroMap has started site operations at the Borssele 1 & 2 offshore wind farm in the Dutch North Sea on behalf of Ørsted.

  • 27 August 2019
    Ports & Logistics, Wind Farm Update

    Sif Holding has entered into an agreement with DEME Offshore to use Maasvlakte 2 in the Netherlands for marshaling services for the Borssele 1 & 2 offshore wind project. The deal comes as Sif agreed with the Port of Rotterdam on the lease of an additional 20ha of industrial land, adjacent to the company’s existing operations at […]

  • 1 May 2020
    Operations & Maintenance

    NHV Group has started carrying out its helicopter services for the Borssele 1 & 2 offshore wind farm in the Netherlands. The flights depart from NHV’s recently installed base in Arnemuiden, Midden-Zeeland, to the project site located 23km from Westkapelle. The company stated it had taken delivery of a new H145 aircraft for the Midden-Zeeland […]

  • 5 March 2020
    Wind Farm Update

    ProCon Wind Energy has completed the electrical construction of 35 transition pieces for the Borssele 1 & 2 offshore wind project at EEW Offshore Structures (Britain) Ltd. ProCon stated that all its tasks have been finished and now only an O&M manual remains for total completion. The company has been providing electrical pre-assembly, installation and […]

  • 12 November 2021
    Business & Finance, Wind Farm Update

    Ørsted has signed a EUR 175 million, 8-year loan agreement with the Nordic Investment Bank (NIB) for co-financing its investment in the Borssele 1 & 2 offshore wind farm in the Netherlands. Together with the loan agreement closed with the European Investment Bank (EIB) on 6 September, the intended long-term financing of Ørsted’s investment in […]

  • 25 October 2018
    Business & Finance, Contracts & Tenders, Wind Farm Update

    Rostock-based EEW Special Pipe Constructions GmbH (EEW SPC) has won a contract to produce 47 monopiles for Ørsted’s Borssele 1 and 2 offshore wind farm.

  • 18 August 2017
    Contracts & Tenders, Operations & Maintenance, Wind Farm Update

    DONG Energy has decided to set up an operation and maintenance base for its 752MW Borssele 1&2 project at the Vlissingen harbour. 

  • 13 January 2020
    Wind Farm Update

    DEME Group has installed the first foundations at Ørsted’s Borssele 1&2 offshore wind project in the Netherlands. DEME’s jack-up vessel Innovation loaded the first set of monopiles at Sif’s facility on Maasvlakte 2 earlier this month and transported them to the wind farm. “The first monopile installed was also the heaviest and tallest on the wind farm, […]

  • 4 June 2020
    Wind Farm Update

    DEME Offshore’s jack-up vessel Innovation has completed the installation of the 94 monopile foundations at the Borssele 1 & 2 offshore wind project. The installation, which began in mid-January in the Dutch North Sea, was completed on time despite the COVID-19 crisis, DEME said. Sif provided 47 monopiles for the project and EEW SPC, the parent […]

  • 12 August 2020
    Wind Farm Update

    78 out of 94 Siemens Gamesa 8 MW turbines have been installed at the Borssele 1 & 2 offshore wind project in the Netherlands. DEME’s jack-up tandem Sea Installer and Sea Challenger are in charge of installing the turbines at the site located 22km off the coast of the province of Zeeland. According to Ørsted, the […]