341 results found for 'dolwin 5'

341 results found for 'dolwin 5'
Order results by

A list of search results

  • 10 July 2024
    Business & Finance, Grid Connection, Offshore Platforms

    Dutch engineering company Iv has designed more than a quarter of all offshore wind platforms in the European Union, the company said on 9 July, citing offshore wind statistics from a WindEurope report. Of the 19 GW of offshore wind energy the EU had installed at the end of 2023, Iv has worked on offshore […]

  • 23 August 2024
    Industry, Market Outlooks, Outlook & Strategy

    According to Rystad Energy, global offshore wind capacity will surpass 520 GW by 2040, with floating wind installations nearing 90 GW by that time. In 2023, the offshore wind sector saw a seven per cent increase in new capacity additions compared to the previous year, said Rystad Energy. This momentum is expected to accelerate this […]

  • 1 August 2024
    Business & Finance, Business development, Contribution, Industry, Jobs & Recruitment, Supply Chain

    This is an op-ed piece by Sam Salustro, Vice President of Strategic Communication at Oceantic Network, the US offshore renewable energy industry organisation.  Six months occupied with questions about the upcoming election have muddied the waters, shifting the conversation about offshore wind energy away from the real groundwork being laid and progress already underway in […]

  • 8 October 2024
    Floating Wind, Industry, Market Outlooks, Outlook & Strategy

    The global pipeline of floating offshore wind projects has expanded from 244 GW to 266 GW in the last twelve months, reflecting a nine per cent increase, according to a report published by RenewableUK. The number of global projects has increased from 285 to 316, with the pipeline including projects at various stages: fully operational, […]

  • 22 August 2024
    Business & Finance, Fixed-Bottom, Floating Wind

    This is an op-ed piece by Liz Burdock, Founder and CEO of Oceantic Network, the US offshore renewable energy industry organisation. When I started Oceantic Network 11 years ago, I was motivated by the confident belief that offshore wind would be an economic and environmental game-changer for the U.S. Not only because of the industry’s […]

  • 8 May 2024
    Business & Finance, Manufacturing, Supply Chain, Wind Turbines

    Siemens Gamesa has initiated comprehensive measures for the operational restructuring of the company with the aim of achieving break-even by 2026 and then returning to profitable growth. As part of the long-term strategic development plan, the company will streamline its onshore business and focus on ramping up the capacities in the offshore business area. “The […]

  • 2 December 2020
    Grid Connection

    Aibel and Keppel FELS have held a strike steel ceremony at Keppel FELS’ shipyard in Singapore to mark the start of construction of the DolWin5 high voltage direct current (HVDC) offshore converter platform. Transmission system operator TenneT selected the Aibel/Keppel FELS consortium to supply the offshore HVDC platform and an onshore converter station for the […]

  • 27 February 2024
    Business & Finance

    Ørsted’s Group Executive Team will see Trond Westlie and Patrick Harnett joining on 1 April following Ørsted’s Board of Directors appointing Westlie as the next Group Chief Financial Officer (CFO) and member of the Executive Board, and Harnett as the Chief Operational Officer (COO) on 27 February. The appointments follow a decision from November last […]

  • 22 February 2024
    Business & Finance, Floating Wind

    Swedish floating wind developer Hexicon and Shell have signed an agreement under which Hexicon will acquire Shell’s 80 per cent stake in the MunmuBaram floating wind project. Once the transaction is closed, Hexicon, which currently holds the remaining 20 per cent stake, will fully own the South Korean project. Under the agreement, Hexicon will pay […]

  • 15 February 2024
    Business & Finance, Cables, Contracts & Tenders, Grid Connection, Supply Chain

    Italy-headquartered Prysmian has finalized three contracts worth in aggregate around EUR 5 billion with the transmission system operator (TSO) Amprion for BalWin1 and BalWin2 offshore grid connection systems and the DC34 underground cable project in Germany. According to Prysmian, this package deal is the largest in value and in km of cable ever awarded to […]

  • 10 November 2021
    Contracts & Tenders, Grid Connection, Wind Farm Update

    Ørsted has awarded Boskalis with the inter-array cable installation contract for the Borkum Riffgrund 3 and Gode Wind 3 offshore wind farms in the German North Sea. The contract includes the transport, installation, and burial of a combined total of 106 inter-array cables, the Netherlands-based company said. Prysmian will supply more than 150 kilometres of […]

  • 9 March 2021
    Wind Farm Update

    Ørsted has commissioned TÜV NORD to certify the submarine cables for the Borkum Riffgrund 3 wind farm, and the transformer station and the submarine cables for the Gode Wind 3 wind farm in the German North Sea. With 83 turbines and a total capacity of 900 MW, Borkum Riffgrund 3 will be the largest wind […]

  • 20 February 2024
    Authorities, Business development, Planning & Permitting, Research & Development

    The Australian Government has launched a consultation on an offshore wind development zone in the Indian Ocean off the Bunbury region in Western Australia (WA) that could host up to 20 GW of offshore wind. The Commonwealth is seeking feedback on a proposed area, which is 7,674 square kilometres and at least 20 kilometres from […]

  • 23 September 2021
    Contracts & Tenders, Wind Farm Update

    Ørsted Wind Power A/S has awarded Pulse Structural Monitoring Ltd. with a contract to provide structural measurement campaigns for Gode Wind 03 and Borkum Riffgrund 03 offshore wind farms. Pulse will be in charge of the load, corrosion, and inclination measurement campaigns for Borkum Riffgrund 03 wind farm and Gode Wind 03 wind farm foundations […]

  • 20 October 2021
    Business & Finance, Wind Farm Update

    Glennmont Partners has signed an agreement with Ørsted to acquire a 50 per cent ownership share in the Borkum Riffgrund 3 offshore wind farm in Germany. The divestment is subject to the final investment decision on the project and to obtaining project permit and merger and foreign investment clearances, with completion of the transaction expected […]

  • 10 February 2017
    Business & Finance, Grid Connection, Operations & Maintenance

    GE Grid GmbH has awarded OIS Offshore Industrie Service and Green Wind Offshore, gathered around the ARGE O&M Project, with a contract to provide maintenance for the 900MW DolWin3 offshore grid connection system.

  • 22 August 2022
    Contracts & Tenders, Grid Connection, Wind Farm Update

    Allseas’ installation vessel Pioneering Spirit has installed the foundation structure for the DolWin kappa offshore platform in the German North Sea, according to TenneT’s latest social media post. After three years of construction, the platform sailed out from the Dragados shipyard in Spain on 5 August and was en route to the Port of Rotterdam […]

  • 13 June 2017
    Business & Finance, Grid Connection

    Transmission system operator (TSO) TenneT Holding B.V. has launched and priced another Green Bond issue under its green bond program of EUR 1 billion.

  • 8 August 2022
    Business & Finance, Grid Connection, Vessels, Wind Farm Update

    The DolWin kappa offshore platform, part of the DolWin6 grid connection project, has sailed out from the Dragados shipyard in Cádiz, Spain, and is en route to the Port of Rotterdam in the Netherlands. After three years of construction, the platform was loaded on the transport barge Iron Lady on 5 August and headed to […]

  • 29 July 2015

    Atlas Professionals has been chosen as the 1st tier supplier for Dutch-German transmission system operator TenneT for the supply of senior personnel to the North Sea. The contract will allow for Atlas’ senior personnel such as Client Representatives to oversee operations of some of TenneT’s Offshore Projects including the various stages of BorWin, DolWin, HelWin […]

  • 5 December 2013

    On Thursday 5 December, the jacking up of Dolwin Beta’s topsides started. The topsides weighs 10,000 tons. It will be jacked up more than 50 meters to be fitter on the substructure by six gigantic jacking towers Drydocks commenced the construction of the June last year. The platform will be ready for sailaway from Dubai […]

  • 5 April 2013
    Grid Connection, Technology

    The demand for the so-called hybrid cables for converter platforms of offshore wind farms and on board vessels is ever more increasing. In addition to the conventional copper wires, the cables combine numerous other components, such as pneumatic and hydraulic hoses, flexible coaxial cables or optical waveguides. “All in one” hybrid cables are space-saving, easily […]

  • 10 December 2013

    DolWin Beta’s topside was placed onto the substructure yesterday. The jacking up of DolWin Beta’s topsides started on December 5. Drydocks World lifted the 10,000-tonne topside of the platform structure to a height of 52.8 metres from the dock bottom. On Saturday, the substructure was moved in position under the topside. Aibel is designing and […]

  • 5 November 2013

    Attendees at the EWEA Offshore exhibition will have the opportunity to meet Royal Wagenborg’s logistic experts, who have extensive experience in the wind power industry. Among the projects in which Royal Wagenborg is and has been involved recently, are offshore wind farms Bard Offshore I, Borkum West II, Global Tech I, Amrumbank and Innogy Nordsee […]

  • 13 August 2012

    This is key to a responsible realisation of the Energiewende” says Lex Hartman, Director Corporate Development of TSO TenneT. “After all, the German ambition implies building one turbine every day.” The recent Atomausstieg and the subsequent Energiewende brought about a revolution in the German offshore wind sector. Over the next ten years, 13GW of offshore […]

  • 8 December 2013

    Storm ‘Christian’ Shakes DanTysk Offshore Wind Farm (Germany)  DanTysk offshore wind farm, situated west of the island of Sylt and directly on the German-Danish border, recently shook under the strength of storm “Christian” that swept through the North Sea. Competition in Offshore Wind Industry to Intensify  With an expected compound average growth rate of 28.3% […]