57 results found for 'green volt'

57 results found for 'green volt'
Order results by

A list of search results

  • 6 June 2025
    Floating Wind, Project Updates, Wind Farm Update

    TGS is conducting a geophysical survey at the site of the Green Volt floating offshore wind project in Scotland, one of the Scottish INTOG round winners and projects planned to provide electricity to oil and gas platforms. The seismic vessel Ramform Vanguard has mobilised from Aberdeen and is scheduled to carry out the survey work at […]

  • 27 February 2025
    Authorities, Floating Wind, Planning & Permitting

    Flotation Energy and Vårgrøn have submitted a consent application to the Scottish Marine Directorate for the 1,350 MW Cenos floating offshore wind farm. The applications involve the offshore elements of the project proposals to construct and operate the floating wind farm, along with the associated offshore transmission assets. “We are taking the learnings and synergies […]

  • 23 June 2025
    Authorities, Business & Finance, Fixed-Bottom, Floating Wind, Planning & Permitting, Supply Chain, Wind Turbines

    The Trump administration has warned the UK government about security risks as Mingyang Smart Energy plans to build a factory in Scotland to manufacture wind turbines for North Sea offshore wind farms, according to a report by the Financial Times, citing a US official. A Chinese analyst has commented on the news, saying the talks […]

  • 2 July 2025
    Business development, Contracts & Tenders, Research & Development, Supply Chain

    TGS has won a contract for offshore wind site characterisation, including acquisition, imaging, and interpretation services offshore Norway. Ramform Vanguard will start acquisition in early July, with a duration of approximately 25 days. The imaging and interpretation work will begin concurrently with data acquisition, and final data delivery to the client is expected in the […]

  • 2 June 2025
    Business development, Industry, Innovation, Technology, Transition

    Digitalisation is a core strength of Norway’s offshore wind industry. Many Norwegian companies offer advanced digital solutions for operational efficiency, safety and sustainability. At Global Offshore Wind 2025 in London, June 17–18, Norwegian offshore wind companies will gather in one place to show why they are global leaders in digitalisation. Norway is recognised for leveraging […]

  • 16 December 2024
    Business & Finance, Business development, Contracts & Tenders, Floating Wind, Grid Connection, Offshore Platforms, Research & Development, Supply Chain

    Flotation Energy and Vårgrønn, a joint venture between Plenitude (Eni) and HitecVision, have awarded the front-end engineering and design (FEED) contracts for the 560 MW Green Volt floating offshore wind project in Scotland to two partnerships. Aker Solutions, in collaboration with ABB, and Aibel, working with Hitachi Energy, will handle the FEED Phase 1 scope […]

  • 24 June 2025
    Cables, Grid Connection, Project Updates, Wind Farm Update

    The final inter-array cable was installed at the 488 MW Îles d’Yeu and Noirmoutier (EMYN) offshore wind farm in France, developed by Les Éoliennes en Mer Services. The 61st and final inter-array cable was installed at the EMYN site located 11.7 kilometres from the island of Yeu and 16.5 kilometres from the island of Noirmoutier. […]

  • 10 December 2024
    Business & Finance, Business development, Research & Development, Supply Chain

    The Crown Estate has awarded nearly GBP 5 million in funding to 13 organisations across England, Wales, and Scotland in the first round of its Supply Chain Accelerator. According to The Crown Estate, the funding will help kick-start projects drawing down from a GBP 50 million fund established in May this year to accelerate and […]

  • 4 June 2025
    Project Updates, Wind Farm Update

    The 488 MW Îles d’Yeu and Noirmoutier (EMYN) offshore wind farm has started supplying green electricity to the French grid, only a few weeks after the installation of the first turbine. Following a successful initial testing phase that began on 23 May, the wind farm’s first Siemens Gamesa 8 MW turbines are now connected to […]

  • 15 November 2024
    Authorities, Business & Finance, Planning & Permitting

    The Low Carbon Contracts Company (LCCC), a UK government-owned company, has signed 130 contracts for a total of 9.58 GW of renewable energy generation, covering the projects that were successful in the country’s latest Contracts for Difference (CfD) Allocation Round 6 (AR6). AR6 secured a broad range of technologies from wind and solar to emerging, […]

  • 7 November 2024
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Vårgrønn has agreed to acquire a 27.4 per cent stake in the 288 MW Baltic 2 offshore wind farm from PGGM Infrastructure Fund, marking its entry into the German market. Following the deal closing, Vårgrønn and EnBW will own 27.4 per cent and 50.1 per cent, respectively, with EnBW responsible for operations and maintenance activities. […]

  • 3 September 2024
    Authorities, Planning & Permitting

    Offshore wind developers have been awarded contracts for approximately 5.3 GW of capacity in the UK’s latest Contract for Difference (CfD) Allocation Round 6 (AR6). Ørsted received the largest CfD for offshore wind, securing 2.4 GW for the Hornsea 4 offshore wind project. The offshore wind farms awarded CfDs are the 288 MW Inch Cape […]

  • 3 September 2024
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Foundations, Supply Chain

    Sif is in exclusive negotiations for a 140-kilotonne monopile foundation project for an offshore wind farm that was awarded a Contract for Difference (CfD) in the UK’s Allocation Round 6 (AR6), the Dutch company informed following the announcement of the AR6 results. “It is expected that a final contract will be reached before the end […]

  • 25 July 2024
    Contracts & Tenders, Floating Wind, Supply Chain

    Rovco has been selected to conduct site characterization operations on the Green Volt floating offshore wind farm project in Scotland. UK-based company will focus on geophysical surveys in the offshore wind farm array area, offshore and nearshore export cable corridors, shallow Piezocone Penetration Test (PCPT), and vibrocoring. Rovco’s DP2 survey vessel Glomar Supporter will begin […]

  • 9 February 2023
    Business development, Transition, Wind Farm Update

    Flotation Energy and Vårgrønn have submitted a Marine Licence application for the Green Volt floating offshore wind farm. This consent application could allow the project to start generating power in the mid-2020s, making it the most advanced oil and gas decarbonisation project in the UK, the developers said. Flotation Energy and Vårgrønn are applying for […]

  • 4 April 2024
    Authorities, Floating Wind, Grid Connection, Onshore Infrastructure, Planning & Permitting, Project Updates, Wind Farm Update

    The Green Volt floating offshore wind farm in Scotland, being developed by Flotation Energy and Vårgrønn, a joint venture between Plenitude (Eni) and HitecVision, has been granted full onshore planning approval. The developers of the floating offshore wind project submitted the offshore consent application to the Scottish Government Marine Directorate on 20 January 2023 and […]

  • 22 April 2024
    Authorities, Floating Wind, Planning & Permitting, Project Updates, Wind Farm Update

    Flotation Energy and Vårgrønn, a joint venture between Plenitude (Eni) and HitecVision, have obtained the offshore planning approval for the Green Volt floating wind farm offshore Scotland. With onshore consent announced earlier this month, Green Volt has now received all its planning approvals and remains on track to be the first commercial-scale floating offshore wind […]

  • 24 December 2021
    Authorities, Environment, R&D, Technology, Wind Farm Update

    Flotation Energy Plc and CNOOC Petroleum Europe Ltd have submitted an Offshore Scoping Report for a floating wind farm offshore Scotland with a capacity of up to 480 MW and scheduled to be operational by 2026. The Green Volt offshore wind farm would feature up to 30 wind turbines with a rated capacity of between […]

  • 2 November 2023
    Collaboration, Floating Wind, Outlook & Strategy, Project Updates, Wind Farm Update

    Vårgrønn, a joint venture between Plenitude (Eni) and HitecVision, and Flotation Energy have signed exclusivity agreements for two floating offshore wind developments under Crown Estate Scotland’s Innovation and Targeted Oil and Gas (INTOG) leasing round. Once completed, the Green Volt and Cenos floating offshore wind farms, with up to a total of 1.9 GW capacity, […]

  • 2 March 2023
    Business development, Wind Farm Update

    Flotation Energy and Vårgrønn, who recently filed a Marine Licence application for their 500 MW Green Volt floating wind farm in Scotland, have now submitted a Scoping Report for the 1.4 GW Cenos floating offshore wind farm to Marine Scotland. The developers have submitted leasing applications for both Cenos and Green Volt as part of […]

  • 7 April 2017
    Technology, Vessels, Wind Farm Update

    Alewijnse Marine provided GeoSea with two QA Bolt Tension Logging systems during the recently completed installation of 56 foundations on the 336MW Galloper wind farm off Suffolk, UK.

  • 12 April 2012

    Ever mindful of the importance of the correct, efficient and safe use of its bolt tensioning and tightening tools, Tentec announced the availability of Engineering Construction Industry Training Board (ECITB) certified bolt training courses and qualifications for the Wind and Renewables industry. With the acquisition of the well-respected Aberdeen-based training company, Peak Performance, Tentec now […]

  • 18 December 2019
    Wind Farm Update

    Jan De Nul’s jack-up vessel Vole au vent has installed the first turbine at the Northwester 2 offshore wind project in Belgium. Northwester 2 will comprise 23 MHI Vestas V164-9.5MW turbines, making it the first wind farm to feature this turbine model. According to MHI Vestas, all major turbine components have been assembled and pre-commissioned […]

  • 21 February 2014

    Sif Group in the city of Roermond is working hard on the production of 43 steel foundation piles for the Eneco Luchterduinen Wind Farm. Ultimately, these piles will be installed 23 kilometres off the coast between Noordwijk and Zandvoort. What makes these foundation piles special is the fact that the wind turbines will be mounted […]

  • 17 January 2024
    Equipment, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update

    The installation of pin piles for the jacket foundations on Taiwan’s 1,044 MW Hai Long offshore wind farm is expected to start in March. CAPE Holland has been contracted to supply its CAPE Vibro Lifting Tools to CSBC-DEME Wind Engineering (CDWE), whose vessel Green Jade will be installing the piles. CDWE signed a contract for […]

  • 13 August 2012

    Today, the latest milestone for the flagship offshore wind farm, Gwynt y Môr, will be achieved with the departure by sea of the UK engineered and built Siemens’ offshore substation. Destined for installation in Liverpool Bay, the 1,500 tonne platform was jointly designed, engineered and fabricated by Siemens in Manchester and Belfast-based shipbuilders Harland and […]