74 results found for 'intog'

74 results found for 'intog'
Order results by

A list of search results

  • 28 May 2024
    Business & Finance, Business development, Industry, R&D, Research & Development, Technology

    The Offshore Renewable Energy (ORE) Catapult and the Net Zero Technology Centre (NZTC) have launched the INTOG Innovation Network, focusing on maximising the impact of commercial, pilot scale, innovative, floating wind projects through the Innovation and Targeted Oil and Gas (INTOG) leasing process. The INTOG leasing round, managed by Crown Estate Scotland, is designed both […]

  • 29 August 2024
    Business development, Floating Wind, Research & Development

    France’s TotalEnergies plans to launch a floating offshore wind pilot project to supply renewable energy to the Culzean offshore platform in the UK North Sea. The 3 MW floating wind turbine will be located two kilometres west of the Culzean platform, 220 kilometres off the eastern coast of Scotland. The wind turbine is planned to […]

  • 20 November 2024
    Floating Wind, Foundations, Manufacturing, Project Updates, Supply Chain, Wind Farm Update

    Archer Wind has started the fabrication of the foundation which will be installed as part of the Culzean floating offshore wind pilot project. This single-turbine, 3 MW pilot project, owned and developed by TotalEnergies, will provide power to the Culzean gas platform in the UK North Sea. According to Archer Wind’s recent social media post, […]

  • 25 July 2024
    Contracts & Tenders, Floating Wind, Supply Chain

    Rovco has been selected to conduct site characterization operations on the Green Volt floating offshore wind farm project in Scotland. UK-based company will focus on geophysical surveys in the offshore wind farm array area, offshore and nearshore export cable corridors, shallow Piezocone Penetration Test (PCPT), and vibrocoring. Rovco’s DP2 survey vessel Glomar Supporter will begin […]

  • 12 September 2024
    Floating Wind, Foundations, Manufacturing, Project Updates, Supply Chain

    Archer Wind has ordered TP-Products’ bolted connections for the floating wind foundation which will be installed as part of the Culzean pilot project. The one-turbine, 3 MW pilot is owned and developed by TotalEnergies and will power the Culzean gas platform in the UK North Sea. TotalEnergies has contracted Archer Wind, a floating wind company […]

  • 2 October 2024
    Authorities, Floating Wind, Grid Connection, Onshore Infrastructure, Planning & Permitting

    Ørsted, Simply Blue Group and Subsea7, through their joint venture partnership in Scotland, have submitted their consent applications for the onshore aspects of the proposed Salamander floating offshore wind farm. The first submission has been made to Aberdeenshire Council for the onshore substation and associated infrastructure and has been accepted, according to the joint venture. […]

  • 14 May 2024
    Floating Wind, Planning & Permitting

    Ørsted, Simply Blue Group and Subsea7, through their joint venture partnership in Scotland, have submitted an offshore consent application for the proposed 100 MW Salamander floating offshore wind farm, one of the 13 projects selected in Scotland’s Innovation and Targeted Oil and Gas (INTOG) leasing round. The floating wind farm, one of the five INTOG […]

  • 22 April 2024
    Authorities, Floating Wind, Planning & Permitting, Project Updates, Wind Farm Update

    Flotation Energy and Vårgrønn, a joint venture between Plenitude (Eni) and HitecVision, have obtained the offshore planning approval for the Green Volt floating wind farm offshore Scotland. With onshore consent announced earlier this month, Green Volt has now received all its planning approvals and remains on track to be the first commercial-scale floating offshore wind […]

  • 4 April 2024
    Authorities, Floating Wind, Grid Connection, Onshore Infrastructure, Planning & Permitting, Project Updates, Wind Farm Update

    The Green Volt floating offshore wind farm in Scotland, being developed by Flotation Energy and Vårgrønn, a joint venture between Plenitude (Eni) and HitecVision, has been granted full onshore planning approval. The developers of the floating offshore wind project submitted the offshore consent application to the Scottish Government Marine Directorate on 20 January 2023 and […]

  • 2 April 2024
    Business & Finance, Business development, R&D, Research & Development

    Scottish Offshore Wind Energy Council (SOWEC) has added seven projects to the three it already selected in February 2024 for priority assessment in the Strategic Investment Model (SIM) funding round. Of these ten projects, five are port facilities, four are supply chain proposals, and one is an equipment project. “Out of the 45 projects that […]

  • 5 March 2024
    Business development, Environment, R&D, Research & Development

    Salamander, a joint venture between Ørsted, Simply Blue Group and Subsea7, has partnered with two Scottish universities to investigate any potential impact of floating offshore wind farms on marine ecosystems. The PREDICT 2.0 initiative forms part of a research programme led by experts at the University of the Highlands and Islands’ (UHI) Environmental Research Institute […]

  • 19 March 2024
    Authorities, Business development, Floating Wind, Innovation, Technology

    Offshore Renewable Energy (ORE) Catapult has opened the National Floating Wind Innovation Centre (FLOWIC), which is said to be the world’s first dedicated innovation centre for floating offshore wind, in Aberdeen, Scotland. The GBP 9 million (approximately EUR 10.5 million) FLOWIC, located in Aberdeen’s Energy Transition Zone and delivered by ORE Catapult in collaboration with […]

  • 6 March 2024
    Floating Wind, Grid Connection, Planning & Permitting, Project Updates, Wind Farm Update

    The developers of the 1.4 GW Cenos floating offshore wind project in Scotland are set to run a nearshore survey campaign in March to revalidate data collected in 2017 by NorthConnect, an interconnector project whose infrastructure Cenos planned to use to connect to the grid. Starting on 11 March, the export cable corridor surveys will […]

  • 21 February 2024
    Business & Finance, Business development, Ports & Logistics, Research & Development

    The Strategic Investment Model (SIM) Working Group of the Scottish Offshore Wind Energy Council (SOWEC) has selected three projects to move into Stage 2 of its programme. The Port of Cromarty Firth Expansion and the Port of Nigg Deepwater Quay Expansion projects will move into Stage 2 of the SIM programme. The Scottish Government revealed […]

  • 13 February 2024
    Authorities, Floating Wind, Planning & Permitting

    The BlueFloat Energy and Renantis partnership have submitted a scoping request and Habitats Regulations Assessment screening report to the Marine Directorate for the Broadshore Hub Wind Farm Development Areas in Scotland. The scoping request seeks the Scottish Minister’s opinion on the scope and details of the Environmental Impact Assessment (EIA) report. The Broadshore Hub Wind […]

  • 25 January 2024
    Authorities, Business & Finance, Business development, Infrastructure, Manufacturing, Planning & Permitting, Research & Development, Supply Chain

    Scotland’s First Minister Humza Yousaf has revealed that three offshore offshore wind projects have been invited to move to Stage 2 of the Strategic Investment Model (SIM) process. The announcement was made at the Scottish Renewables and Offshore Wind Conference in Glasgow. In addition, INTOG offshore wind projects connected to the offshore oil and gas sector will […]

  • 29 November 2023
    Authorities, Business development, Planning & Permitting, Project Updates, Research & Development, Wind Farm Update

    Crown Estate Scotland has confirmed that seven offshore wind projects have signed Exclusivity Agreements as part of the Innovation and Targeted Oil & Gas (INTOG) leasing round. The seven projects join the five Innovation projects that secured Exclusivity Agreements earlier this year, bringing the number of INTOG projects to 12 out of the 13 agreements […]

  • 24 March 2023
    Authorities, Business development, Contracts & Tenders, Industry, Innovation, Outlook & Strategy, R&D, Research & Development, Technology, Transition

    Crown Estate Scotland has selected 13 out of a total of 19 applications with a combined capacity of around 5.5 GW in the world’s first leasing round designed to enable offshore wind energy to directly supply offshore oil and gas platforms. INTOG (Innovation and Targeted Oil & Gas) leasing aims to attract investment in innovative […]

  • 3 August 2023
    Authorities, Floating Wind

    After selecting 33 offshore wind projects through the ScotWind and Innovation and Targeted Oil & Gas (INTOG) leasing rounds, the Scottish government is now revising its original Sectoral Marine Plan (SMP) for offshore wind as part of its iterative plan review process and working on an SMP for INTOG. The final Sectoral Marine Plans are […]

  • 8 April 2022
    Contribution, Industry

    A study commissioned by Crown Estate Scotland has revealed that connecting offshore wind installations directly to oil and gas platforms could help decarbonisation, support economic activity, and encourage new companies to enter the offshore renewable energy sector. The report, carried out by independent consultancy company Natural Power on behalf of Crown Estate Scotland, follows the […]

  • 14 April 2022
    Wind Farm Update

    Should Cerulean Winds’ 200+ turbine floating wind project be selected in the upcoming auction in Scotland, Dubai-based manufacturer Lamprell – which signed a Memorandum of Understanding (MoU) for the project with its preferred Tier 1 supplier NOV – would deliver its part of the project out of the UK and utilise local supply chain, the […]

  • 10 August 2022
    Contracts & Tenders, Environment, R&D, Technology

    Crown Estate Scotland has opened the Innovation and Targeted Oil and Gas (INTOG) offshore wind leasing process aimed at promoting innovations and decarbonising the UK’s oil and gas sector. A two-week registration window opened on Wednesday, 10 August. The application window will open later this month. Offshore wind developers are being invited to put forward […]

  • 22 May 2023
    Authorities, Innovation, Wind Farm Update

    All five innovation projects selected in Scotland’s INTOG (Innovation and Targeted Oil & Gas) leasing round have now signed exclusivity agreements with Crown Estate Scotland, which allows the developers to start offshore wind development work while Marine Scotland’s planning process for the INTOG Sectoral Marine Plan (INTOG SMP) is completed. The INTOG leasing round has three key […]

  • 22 February 2022
    Authorities, Contracts & Tenders, Environment, R&D, Technology

    Crown Estate Scotland has revealed the proposed details of its Innovation and Targeted Oil and Gas (INTOG) offshore wind leasing process. Developers will apply for the rights to build small-scale innovative offshore wind projects of less than 100 MW, as well as larger projects connected to oil and gas infrastructure to provide electricity and reduce […]

  • 20 September 2022
    Contracts & Tenders, Environment, Industry, R&D

    Vårgrønn and Flotation Energy have formed an offshore wind partnership aimed at decarbonising the oil and gas industry in Scotland. Vårgrønn, a Norwegian full cycle offshore wind company owned by Plenitude (Eni) and HitecVision, and Flotation Energy, an Edinburgh-based floating wind specialist, plan to generate renewable energy from offshore wind farms to enable the electrification […]

  • 21 November 2022
    Authorities

    Crown Estate Scotland has closed the window for applications under its Innovation and Targeted Oil and Gas (INTOG) leasing round, dedicated to offshore wind projects that will directly reduce emissions from oil and gas production and to small scale innovation projects, including alternative outputs such as hydrogen. A two-week registration window for INTOG opened in […]