470 results found for 'london array'

470 results found for 'london array'
Order results by

A list of search results

  • 17 June 2024
    Business development, Cables, Collaboration, Grid Connection, Innovation, Outlook & Strategy, Technology

    UK companies 2H Offshore and Vekta Group have established a strategic partnership aimed at driving innovation in high-voltage cables for offshore wind developments. London-headquartered 2H provides structural, hydrodynamic, geotechnical engineering and related digital and integrity services for fixed and floating wind, while Edinburgh-headquartered Vekta focuses on electrical engineering of high voltage cables for offshore renewables […]

  • 4 September 2024
    Fixed-Bottom, Project Updates, Wind Farm Update

    The first of the 65 Siemens Gamesa SG 11.0-200 DD wind turbines has been installed at Ørsted’s 704 MW Revolution Wind offshore wind farm in the US. The Revolution Wind offshore wind farm will utilise 65 Siemens Gamesa turbines, the same 11 MW turbine model used at the recently completed South Fork Wind. Once in operation, the […]

  • 14 March 2024
    Business & Finance, Fixed-Bottom

    RWE has reported an adjusted EBITDA of nearly EUR 1.7 billion in its offshore wind segment for 2023, compared to EUR 1.4 billion for the previous fiscal year. The increase in earnings is due to the commissioning of new capacity and better wind conditions, according to the company. Electricity generation from renewable energy at RWE rose by […]

  • 10 September 2013
    Grid Connection

    London Array, a joint venture owned by DONG Energy (50%), E.ON (30%) and Masdar (20%), announced that it has signed an agreement for the sale of transmission assets at the world’s largest offshore wind farm to Blue Transmission London Array Limited. The divestment takes place pursuant to the Offshore Transmission Owner (OFTO) regime. Following a […]

  • 10 August 2012
    Wind Farm Update

    A new milestone has been reached with the erection of London Array’s 100th wind turbine. The landmark was reached at 18.45 on Tuesday, 7 August when the turbine’s final blade was lifted into place. “With 100 wind turbines now assembled, more than three quarters of the foundations completed and the two offshore substations in place, […]

  • 9 September 2013

    London Array, the world’s largest offshore wind farm, has appointed DSH Chartered Accountants & Business Advisors in Maidstone to provide it with accounting and tax services for the next three years. For DSH partner Duncan Cochrane-Dyet, the appointment is recognition of the quality of DSH’s teams.  “When we were invited to tender, we knew it […]

  • 13 December 2012
    Wind Farm Update

    London Array today announced that the 175th and last turbine at the first 630MW phase of the London Array Offshore Wind Farm has been installed, marking the end of major construction activities. Turbine installation began in January 2012 and has been completed by MPI Discovery, A2SEA’s Sea Worker and Sea Jack. With all turbines in […]

  • 12 February 2015
    Environment, R&D, Wind Farm Update

    MarineSpace Ltd has recently been awarded the contract by London Array Ltd to produce the Year 1 Post-Construction Environmental Monitoring Annual Report for the London Array Offshore Wind Farm.  Environmental issues have been a key focus of this project from the EIS stage to date, and publication of the Annual Report summarising the key findings […]

  • 1 April 2016
    Operations & Maintenance, Technology, Wind Farm Update

    BPD Zenith has been selected to deliver its Maximo for Offshore Wind asset management solution to the 630MW London Array, the world’s largest operational offshore wind farm. The system will be used to support the subsequent phases of the wind farm’s lifecycle. Maximo for Offshore Wind is based on IBM Maximo, an enterprise asset management system, […]

  • 5 June 2018
    Contracts & Tenders

    Spectrum Offshore has secured a five-year contract to provide combined crew transfer and survey services for the London Array offshore wind farm.

  • 2 June 2015
    Operations & Maintenance, Wind Farm Update

    London Array’s second full year of generation has seen output from the offshore wind farm pass the 5TWh mark. The wind farm became fully operational in April 2013, having first started exporting power in October 2012. Output to date now amounts to electricity equivalent to the annual consumption of some 1.2m UK households. Over the […]

  • 11 August 2015
    Business & Finance, Vessels

    CWind has been awarded a contract for the supply of two crew transfer vessels to the London Array offshore wind farm supporting operation and maintenance activities. London Array is located 20 km off the Kent coast in the outer Thames Estuary. Both workboats, the CWind Alliance and CWind Artimus, will be operating from Ramsgate in […]

  • 18 April 2018
    Contracts & Tenders, Operations & Maintenance, Wind Farm Update

    James Fisher Marine Services (JFMS) has been appointed by London Array to deliver Balance of Plant (BoP) Operations and Maintenance (O&M) services covering the wind farm’s next five years of operation.

  • 30 September 2013
    Authorities, Grid Connection

    Pinsent Masons has advised London Array, a joint venture between DONG Energy, E.ON and Masdar, on the £459 million disposal of the offshore wind farm’s transmission assets to Blue Transmission London Array Limited – a consortium comprising Barclays Infrastructure Funds Management Limited and Diamond UK Transmission Corporation (a wholly owned subsidiary of Mitsubishi Corporation) – […]

  • 5 October 2012
    Grid Connection, Wind Farm Update

    In early September the London Array Consortium started installing London Array’s last export cable. The export cables run from offshore substations to the onshore substation at Cleve Hill, where the power generated by London Array will flow into the national electricity network. The cables have been buried in trenches dug into the seabed and as […]

  • 29 May 2014
    Operations & Maintenance, Wind Farm Update

    Remedial construction works at the London Array Offshore Wind Farm have been launched and will be performed until August 2014. The work is being done at a number of turbines locations. Red7Marine Offshore Ltd is undertaking diving and construction work within the London Array site. Operations will be conducted from the vessel Red7 Reel, a […]

  • 21 October 2015
    Operations & Maintenance, Vessels

    Gardline Environmental’s Coastal Division has recently been awarded contract extensions at the London Array offshore wind farm. These extensions mean that the Marian Array, Ellida Array and Smeaton Array, as well as the Gardian 7, will continue crew transfer operations supporting the O&M teams at London Array through the winter and into the New Year. […]

  • 17 April 2018
    Business & Finance, Contracts & Tenders, Grid Connection, Operations & Maintenance, Wind Farm Update

    UK consultancy MarineSpace Ltd has won a contract from London Array Limited for the provision of consent and licensing services at the 630MW London Array offshore wind farm in the Thames Estuary.

  • 2 December 2011

    Dong Energy, appointed to operate and maintain London Array, is looking to recruit people to work on the Operation and Maintenance of the wind farm. London Array is a joint venture between Dong Energy, E.ON and Masdar. Dong Energy will operate London Array on behalf of the consortium with successful applicants employed by Dong Energy […]

  • 28 May 2010
    Business & Finance, Operations & Maintenance, R&D, Training & Education

    Postgraduate student Nathalie Kolasa who is currently studying for an MSc in Management at the Ashcroft International Business School (AIBS) at Anglia Ruskin University has secured a research project with a difference – she is set to work with the London Array offshore wind farm project. Nathalie approached the London Array project and has successfully […]

  • 28 April 2020
    Business & Finance

    Masdar Energy UK, a wholly-owned subsidiary of Masdar, has refinanced its stake in the 630 MW London Array offshore wind farm in the UK. The refinanced debt totalled approximately GBP 466 million in commercial bank debt, maturing in December 2032. Original financing for the project closed in October 2013. Located off the coast of Kent […]

  • 1 November 2011
    Wind Farm Update

    The London Array consortium, Abu Dhabi’s Masdar, E.ON, Dong Energy on Monday announced that work is under way at the world’s largest offshor… (wam) [mappress] Source: wam, November 01, 2011

  • 13 July 2018
    Operations & Maintenance, Vessels

    M.C. Construction (Cleveland) has completed the fabrication and mobilisation of steelwork for MPI Adventure ahead of the vessel’s upcoming works on the removal, upgrade and re-installation of turbine blades at the London Array offshore wind farm.

  • 18 May 2012
    Operations & Maintenance

    London Array’s Operations & Maintenance (O&M) base at the Port of Ramsgate was officially opened by local MP Laura Sandys on Friday 9 March. The base will be home to around 70 wind farm technicians and up to 20 support staff, who’ll be responsible for operating and maintaining London Array for the next 20 years. […]

  • 17 January 2012

    The new type of wind turbine foundation design used by London Array has been given the seal of approval by industry certification experts DNV. London Array is among the first in the world to use a conical joint at the top of its monopiles to prevent transition piece slippage. The design was undertaken in parallel […]

  • 13 February 2013

    Last year in December the last turbine was installed at the London Array offshore wind farm. Check out this interesting 3D animation about this project. [mappress] Offshore WIND staff, February 13, 2013; Image: london array