5658 results found for 'Beacon Wind '

5658 results found for 'Beacon Wind '
Order results by

A list of search results

  • 25 April 2012

    UK-based design, engineering and technology company Enventi announced that John Smith has joined the company as shareholder and Director and in conjunction, has launched a significant initiative aimed at producing a fullyintegrated design for an offshore wind farm, deployable at £100/MWh. John brings a wealth of experience to Enventi having occupied several senior management roles […]

  • 18 March 2021
    Business & Finance, Contracts & Tenders, Wind Farm Update

    Air Liquide has signed a long-term Power Purchase Agreement (PPA) with Vattenfall for the Hollandse Kust Zuid offshore wind farm, the first such contract for the 1.5 GW project and also the first PPA Air Liquide signed in the Netherlands. Under a 15-year agreement, Air Liquide will purchase 100 GWh of renewable electricity per year generated […]

  • 2 November 2011

    According to a new report published by Transparency Market Research, “Global Wind Energy & Wind Turbine Market (2011 – 2016)” The global market for wind turbineregistered growth rate of 25% CAGR over the last five years. The Global Wind Energy cumulative capacity accounted for 197,039 MW in 2010.Wind turbine expected to attain market size of […]

  • 28 May 2020
    Contracts & Tenders, Wind Farm Update

    Ailes Marines has awarded Prysmian Group with a contract to provide the inter-array cable systems for the Saint-Brieuc offshore wind farm in France. Prysmian will design, supply, install, and commission 90 kilometres of three core 66 kV HVAC XLPE-insulated inter-array cables. The value of the contract is around EUR 80 million. Cable cores will be […]

  • 23 November 2018
    Authorities, Business & Finance

    The UK Energy and Clean Growth Minister Claire Perry has confirmed that the UK Government and the offshore wind industry are close to reaching a Sector Deal. 

  • 5 September 2013
    Authorities

    In a step forward for offshore wind energy development, the Bureau of Ocean Energy Management, Department of Interior auctioned approximately 113,000 acres off the coast of Virginia for commercial wind energy development for over $1.1 million. The wind energy area, around 23.5 nautical miles off of Virginia Beach, has the potential to produce more than […]

  • 23 March 2012

    Ireland is on the threshold of becoming an exporter of energy. Having traditionally imported fuel or burned locally-produced peat to provide energy, Ireland is now looking at bringing in €6bn a year in export revenues in less than a decade. The source of this potential “windfall” is the increasing number of wind farms around the […]

  • 19 January 2016

    HBB Hanseatic Break Bulk is a marine logistics company acting as an independent shipbroker and Heavy Lift Agency based in Hamburg, Germany. An integrated part of HBB’s business is to develop coastal concept studies for transportation of Offshore Wind foundations and components. Foundation installation likely to become bottleneck The installation part of Offshore Wind turbines, […]

  • 14 November 2013

    CWind Resolution, which is due to be named later today in Brightlingsea, is the second CWind’s vessel that has gained the new class notation ‘Wind Farm Service Ships’ introduced by Bureau Veritas earlier this year. The CWind Resolution is only the second ever vessel to be classed under this notation to date, joining its sister […]

  • 26 July 2017
    Business & Finance, Vessels

    German shipping company Harren & Partner and Japanese “K” Line have reached an agreement for Harren & Partner to acquire SAL Heavy Lift on 27 July 2017. SAL has been fully-owned by “K” Line since 2011.

  • 11 July 2017
    Business & Finance

    Twenty one local organisations in coastal areas of Yorkshire, Lincolnshire and North Norfolk have secured a total of GBP 195,000 in grants in the first round of DONG Energy’s GBP 9.3 million East Coast Community Fund.

  • 8 January 2013

    ArGe Baltic 2 foundations, a Joint Venture between Hochtief and GeoSea, has awarded Ulstein Idea Equipment Solutions BV a contract for the Engineering, Procurement, Construction and Installation (EPCI) of a complete pile upend as well as lifting tool for the Baltic 2 wind farm installation project. By using basic laws of mechanical equilibrium, Ulstein Idea […]

  • 5 August 2016
    Authorities, Business & Finance, Grid Connection, Wind Farm Update

    DONG Energy has filed an Interconnection Request Application with ISO-New England to use 800MW of interconnection capacity of Brayton Point power station in Somerset, Massachusetts, for bringing offshore wind energy generated by the Bay State Wind farm onto the grid. Given upcoming retirement of the existing coal plant at the facility, scheduled for 2017, roughly 1,000 MW of interconnection capability is expected […]

  • 30 December 2016
    Authorities, Business & Finance, Contracts & Tenders, Environment, Grid Connection, Operations & Maintenance, R&D, Technology, Training & Education, Vessels, Wind Farm Update

    We are leaving what has arguably been the best year for offshore wind so far with a hope that the one ahead of us will be at least as eventful and successful as 2016 was, if not better. The Eurocents This year, we saw several tenders resulting in remarkably low prices. First, there was Borssele […]

  • 29 August 2016
    Environment, Training & Education

    Danish offshore wind developer DONG Energy will be taking 4,500 compatriots on offshore wind safaris this September to showcase how the company’s offshore wind farms are contributing to the country’s green energy transformation. According to a survey conducted by Megafon, eight out of ten Danes support the conversion of the energy supply from fossil fuels to […]

  • 21 August 2013
    R&D, Technology

    The wind power market currently provides almost 3 percent of global electricity production. As the wind power industry matures, wind forecasting technologies are becoming critical in order to integrate greater amounts of variable wind energy into the grid.  Meteorological towers, or met towers, the predominant solution at present, serve a range of forecasting needs. According […]

  • 13 March 2023
    Business & Finance, Contracts & Tenders, Ports & Logistics

    Vestas has signed a five-year agreement with Blue Water for handling wind turbine components at Blue Water’s terminals in Denmark and Germany. The agreement covers terminal handling of the heavy wind turbine components, stevedoring, storage and service for five years on all Vestas’ components which are shipped to and from all over the world via […]

  • 18 September 2020
    Operations & Maintenance, Vessels

    The Esvagt Dana Service Operation Vessel (SOV) is currently preparing for assignments at the Borssele III & IV and the Northwester offshore wind farms in the Netherlands and Belgium, respectively. This is according to SMST, which shared an update on the SOV via social media on 17 September. “In these wind farms more height is […]

  • 17 January 2018
    Grid Connection, R&D

    Poland could have 4GW of installed offshore wind capacity in the Baltic Sea by the end of 2030 and 8GW by the end of 2035, according to the Foundation for Sustainable Energy (FNEZ).

  • 10 April 2013

    Mabey Bridge – the UK wind turbine tower manufacturer and bridge-builder – has appointed Claus Poulsen as ‘Sales Director – Renewables’ to develop new business opportunities in the renewables market. The company – which employs 600 people in the UK with a turnover exceeding £80m per annum – has hired the industry leader as it […]

  • 13 August 2012
    Business & Finance

    The Sierra Club Foundation announced that Shirley Weese Young, Chicago graphic designer and land conservationist, is the newest member to join the Board of Directors. Young’s resolve to see Chicago become a leader in renewable energy and her commitment to the Sierra Club is inspirational. Passionate about transitioning to offshore wind in Lake Michigan and […]

  • 12 October 2011

      Research and Markets has announced the addition of the “Wind Energy Report Ed 1 2011” report to their offering.  Research and Analysis Highlights: 2010 was a weak year for the wind industry with only 37 GW installed. Once again growth was lead by the Chinese market, which accounted for around one of every two […]

  • 4 January 2012

    Aside from upfront costs, the maintenance of offshore wind farm assets represents a sizeable cost of any project. It is therefore in the renewable industry’s interests to find ways to drive down this cost – while all the time guaranteeing the integrity of its installations. This article explains how a maintenance regime that borrows from […]

  • 22 October 2018
    Contracts & Tenders, Jobs & Recruitment, Ports & Logistics, Wind Farm Update

    Ørsted has selected Siemens Gamesa Renewable Energy as the preferred supplier for the Greater Changhua offshore wind farms with a combined capacity of 900MW.

  • 9 August 2021
    Operations & Maintenance, Ports & Logistics, Vessels, Wind Farm Update

    Ørsted’s new service operations vessel (SOV) Wind of Hope has arrived in the Port of Grimsby in the UK to prepare for working out at sea on the world’s largest offshore wind farms. Up to 60 of Ørsted’s wind turbine technicians will call the 84-metre vessel home for two weeks at a time, whilst they […]

  • 31 August 2018
    Business & Finance, Contracts & Tenders, Wind Farm Update

    German-based offshore wind developer innogy has reached financial close for the 860MW Triton Knoll offshore wind farm in the UK, worth around GBP 2 billion, and moved the project towards construction that starts with the onshore electrical system in September.