10000 results found for 'Ocergy'

10000 results found for 'Ocergy'
Order results by

A list of search results

  • 14 May 2025
    Business development, Project Updates, Research & Development, Wind Farm Update

    Ørsted has completed geotechnical and geophysical investigations at two Gippsland offshore wind farm sites in Australia. Using specialist vessels and equipment, the developer tested approximately 60 locations across its two feasibility licence areas by scanning and sampling the seabed in the Bass Strait off the Gippsland coast. The data should help Ørsted understand the composition […]

  • 22 January 2025
    Floating Wind, Project Updates, Wind Farm Update

    Ireland-based XOCEAN has completed the geophysical survey along the 420-kilometre cable route for the proposed 3.6 GW Ossian floating offshore wind farm in Scotland. The survey, conducted using uncrewed survey vessels (USVs), took place over a span of 13 months, in water depths ranging from the shoreline to over 100 metres. The gathered data will […]

  • 23 June 2025
    Authorities, Grid Connection, Offshore Platforms, Planning & Permitting

    German transmission system operator (TSO) Amprion has received planning approval to begin construction work on the BalWin1 and BalWin2 offshore grid connections in the German North Sea. Amprion received approval for the approximately 34-kilometre-long section in the coastal waters of Lower Saxony. Following approval, construction work on the island of Norderney can begin in July, […]

  • 20 February 2025
    Business & Finance, Operations & Maintenance, Vessels

    Three Norway-based offshore energy vessel and service providers, Eidesvik, Agalas and Reach Subsea, are building a new construction support vessel (CSV) for subsea and offshore wind operations. The vessel will be two-thirds owned by an entity owned by Eidesvik and Agalas, controlled by Eidesvik, and one-third owned by Reach Subsea. The new CSV will have […]

  • 3 July 2025
    Business development, Project Updates, Research & Development, Wind Farm Update

    Specialist contractors have completed a benthic survey along a 420-kilometre stretch of seabed for the proposed Ossian floating offshore wind farm in Scotland. The month-long benthic campaign gathered information at 122 different sites along the route that will be used to export renewable energy from the Ossian floating offshore wind farm off the east coast […]

  • 5 February 2025
    Authorities, Contracts & Tenders, Fixed-Bottom, Planning & Permitting

    German Federal Network Agency (BNetzA) has launched a tender for the N-9.4 offshore wind site in the North Sea which can accommodate 1 GW of installed offshore wind capacity. The tender is open for bids until 1 June with the maximum bidding value set at 6.2 eurocents/kWh as per Section 19 of the Offshore Wind Energy […]

  • 3 March 2025
    Cables, Grid Connection, Project Updates, Wind Farm Update

    Louis Dreyfus TravOcean and Prysmian will soon resume the inter-array cable installation at the Îles d’Yeu and Noirmoutier offshore wind farm site in France. According to a recent social media post from Louis Dreyfus TravOcean, 5 strings and 37 cables are left to be installed and connected at the site of the 61-turbine offshore wind […]

  • 10 March 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    As part of the pre-construction works at the Hornsea Four offshore wind farm site in the UK, Ørsted will carry out a geophysical survey campaign, starting in late March/early April, to investigate the physical characteristics of the seabed. The data acquired from the campaign will be used for detailed foundation design and installation activities, jack-up […]

  • 28 January 2025
    Foundations, Manufacturing, Project Updates, Supply Chain, Wind Farm Update

    CNOOD-Wenchong Heavy Industries (CWHI) and Inch Cape Offshore, a joint venture between ESB and Red Rock Renewables, have marked the first steel cutting for the transition pieces that will be installed at the 1.1 GW Inch Cape offshore wind farm. The transition pieces (TPs) will be manufactured at CWHI’s Zhongshan and Longxue yards in China and […]

  • 4 February 2025
    Business & Finance

    Interocean Marine Services (Interocean) has secured a three-year contract to provide marine vetting and assurance to the Morgan, Mona, and Morven offshore wind projects in the UK. According to Interocean, the company has an extensive track record in delivering complex offshore projects across the offshore energy sectors, including high-value cargo transportation, mooring installation, and walk-to-work […]

  • 26 March 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    TGS is scheduled to start geophysical survey work across the Dogger Bank South (DBS) offshore wind farm sites in the UK on 27 March. According to a Notice to Mariners issued by the DBS project, the Norway-based energy data and intelligence company will be using the seismic vessel Ramform Vanguard, supported by the guard/scout vessel […]

  • 14 April 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    Energy and marine consultancy company ABL will provide marine warranty survey (MWS) services for the Inch Cape offshore wind farm during the entire construction period of the 1.1 GW project in Scotland. ABL will act as marine warranty surveyor for the transport and installation of the jacket and monopile foundations, offshore substation platform, wind turbines, […]

  • 9 April 2025
    Business & Finance, Industry

    DEME has signed an agreement to acquire Havfram, an international offshore wind contractor based in Norway. Havfram is primarily owned by Sandbrook Capital, a private investment firm focused on climate infrastructure, and the Public Sector Pension Investment Board (PSP Investments), one of Canada’s largest pension investors. The agreement represents an aggregated transaction value of approximately […]

  • 10 June 2025
    Business & Finance, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    Atlantic Shores Offshore Wind has submitted a request to the New Jersey Board of Public Utilities (NJBPU), seeking that the existing offshore renewable energy credit (OREC) order, issued by the NJBPU in 2021 for 1,509.6 MW of generation capacity at Atlantic Shores Project 1, be terminated. The developer, which planned to take the final investment […]

  • 13 January 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update

    Copenhagen Infrastructure Partners (CIP) has contracted the Dutch offshore construction company Van Oord and the joint venture between Belgian offshore construction specialist DEME and Taiwan’s largest shipbuilder CSBC for installation work at the Fengmiao 1 offshore wind farm in Taiwan. Van Oord’s contract covers the transport, installation and burial of the 33 inter-array cables, with […]

  • 12 March 2025
    Business & Finance, Fixed-Bottom, Project Updates, Vessels

    Cadeler held a naming ceremony for its second P-class wind installation vessel at the COSCO shipyard in Qidong, China, on 12 March. Named Wind Pace, the jack-up is the seventh wind installation vessel in Cadeler’s fleet and will see its first deployment immediately after delivery on an offshore wind project in the United States. Like […]

  • 4 June 2025
    Infrastructure, Operations & Maintenance

    The construction of the operations & maintenance (O&M) base for the 1.5 GW Baltica 2 offshore wind farm has officially started with a groundbreaking ceremony at the Port of Utska in Poland.  Representatives from PGE Polska Grupa Energetyczna, Ørsted, the general contractor Doraco, and the contract engineer Sweco Polska, as well as representatives of the […]

  • 4 February 2025
    Business & Finance, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    Mitsubishi Corporation is reevaluating its offshore wind projects in Japan, planned to be built in the waters off the coasts of Akita Prefecture and Chiba Prefecture. The Japanese energy company said on 3 February it put the business plans for the projects under review “due to material changes in the macroeconomic environment.“ Mitsubishi Corporation, through […]

  • 19 February 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Enefit Green has signed an agreement with Sumitomo Corporation to sell a 50 per cent stake in Liivi Offshore OÜ, the project company behind the Liivi Bay offshore wind farm, planned to be built in Estonia. Under the agreement, obtaining approval from the Estonian Consumer Protection and Technical Regulatory Authority (CPTRA) is a precondition for […]

  • 31 March 2025
    Contracts & Tenders, Fixed-Bottom, Supply Chain

    Ørsted has awarded OEG Energy Group with a three-year contract for crane and lift servicing, lifting inspection and maintenance support across six offshore wind farms Ørsted has in Germany. OEG operations and maintenance (O&M) technicians will inspect a total of 337 turbines across the six offshore wind farms, operating from a vessel provided by the […]

  • 16 May 2025
    Business & Finance, Business development, Industry, Ports & Logistics, Vessels

    The Maritime Cluster Northern Germany (MCN), the Netherlands Business Support Office (NBSO), Innovation Norway, the Dutch development agency NOM, the Province of Groningen, and Danish Maritime have launched a strategic cooperation with a goal of strengthening the cross-border maritime economy in the context of offshore wind expansion. Germany, Denmark, Norway, and the Netherlands are pursuing […]

  • 21 March 2025
    Business & Finance, Cables, Contracts & Tenders, Fixed-Bottom, Grid Connection, Supply Chain

    Hellenic Cables, in a consortium with Asso.subsea, has been awarded a turnkey contract by the French transmission system operator (TSO) Réseau de Transport d’Électricité (RTE) for the Dunkirk offshore wind farm. Hellenic Cables will design, manufacture, and supply 32 kilometres of submarine cables for the double submarine cable link, as well as 38 kilometres of […]

  • 28 March 2025
    Fixed-Bottom, Planning & Permitting, Project Updates

    G-TEC has completed a seabed survey in the Doordewind Wind Farm Zone (DDWWFZ) under a contract the Belgian geophysical survey specialist signed with the Netherlands Enterprise Agency (RVO) in 2024. The offshore work was carried out by G-TEC’s survey vessels Mainport GEO and Karina. Through the survey, the company acquired, processed, and delivered a range […]

  • 16 April 2025
    Business & Finance, Fixed-Bottom

    Deep Wind Offshore (DWO) and South Korean marine services company Dongyang have signed a Memorandum of Understanding (MOU) under which the two companies will collaborate to support the offshore wind industry in South Korea. “This MOU represents a key step in building a strong regional collaboration framework to support offshore wind development along Korea’s southern […]

  • 22 April 2025
    Business development, Floating Wind, Research & Development

    UK-based Offshore Solutions Group (OSG) has signed a two-year Exclusivity Agreement with Crown Estate Scotland for areas in the Moray Firth to develop its FLOW-Park. The Moray FLOW-Park aims to provide temporary safe anchorage (wet storage) for floating offshore wind foundations, optimising risk management and logistics during assembly, wind turbine integration, and deployment, said OSG. […]

  • 11 June 2025
    Business & Finance, Business development, Innovation, Technology

    A newly launched project in China is set to build what the project partners say will be the world’s first commercial underwater data centre powered by offshore wind. The project will be developed in two phases, with the first phase being a demonstration facility and the second phase scaling up the capacity to commercial scale. […]