934 results found for 'baltic 1'

934 results found for 'baltic 1'
Order results by

A list of search results

  • 20 January 2021
    Business & Finance

    CWind Taiwan has signed an exclusive cooperation agreement with E&Y Electronics, a Taiwanese power cable service provider specialised in cable testing and termination, to develop its cable maintenance services in the Taiwanese offshore wind market. The services under the cooperation agreement include low and high voltage inspection, maintenance and repair (IMR) solutions, as well as […]

  • 16 July 2020
    Business & Finance

    TenneT has issued a EUR 1 billion Green Hybrid Bond, from which the proceeds will be used to connect large-scale offshore wind to the electricity grid, with investors showing “keen interest” and the issue being 2.5 times oversubscribed. On 15 July, the transmission system operator priced its EUR 1 billion Green Hybrid Bond issue with […]

  • 10 March 2016
    Business & Finance, R&D, Technology, Vessels

    Using High Wind’s Boom Lock tool to increase the wind speed limit for turbine component lifts from 11m/s to 16m/s leads to an average of 1.3% decrease in the levelised cost of energy (LCOE), a study carried out by BVG Associates on a representative 500MW wind farm has shown. An increase in the wind speed limit for […]

  • 15 June 2017
    Operations & Maintenance, Technology

    DEME Group’s offshore wind division is looking into the possibility of using drones to inspect the foundations of the offshore wind turbines for corrosion.

  • 27 July 2021
    Authorities, Contracts & Tenders, Wind Farm Update

    The Crown Estate has selected three floating offshore wind demonstration projects through its recently launched leasing opportunity for early commercial-scale floating wind projects in the Celtic Sea.   The three projects have been proposed by two joint ventures, Offshore Wind Ltd (OWL), a joint venture between Cobra and Flotation Energy, and Floventis Energy Limited, a newly established joint […]

  • 24 September 2018
    Business & Finance, Contracts & Tenders, Grid Connection, Jobs & Recruitment, Operations & Maintenance, Vessels

    Swedish offshore wind power developer and operator Vattenfall has signed a five-year cable repair framework agreement with power cable and asset management services provider CWind covering Vattenfall’s European assets.

  • 14 March 2019
    Contracts & Tenders, Wind Farm Update

    Ørsted will be submitting a bid in the Dutch offshore wind tender for the Hollandse Kust (zuid) 3&4 (Holland Coast South 3&4). As part of its proposal to the Dutch government, Ørsted has already taken the final investment decision on the project and is working to establish green hydrogen projects based on power from its […]

  • 12 April 2023
    Business & Finance, Wind Farm Update

    RWE and Ocean Breeze Energy have entered into a long-term power purchase agreement (PPA) for the BARD Offshore 1 offshore wind farm in Germany, under which RWE Supply & Trading will market the wind farm’s electricity production under the direct marketing scheme, starting this month. RWE also plans to use the wind farm’s electricity to […]

  • 21 July 2016
    Grid Connection

    In the presence of the French President Francois Hollande and An Taoiseach (Irish Prime Minister) Enda Kenny, EirGrid and RTE today signed a Memorandum of Understanding to move to the next phase of development of the Celtic Interconnector Project. Following the completion of feasibility studies over the past five years, EirGrid and RTE today agreed to progress […]

  • 20 September 2021
    Authorities, Contracts & Tenders, Wind Farm Update

    Vineyard Wind has submitted two proposals in response to the Request for Proposals (RFP) for offshore wind energy projects in Massachusetts, offering options of approximately 800 MW and 1,200 MW. The developer’s proposals, named Commonwealth Wind, include the development of an offshore wind project in an area just south of the Vineyard Wind 1 and […]

  • 22 August 2013
    Business & Finance, Wind Farm Update

    RES Offshore has signed an Engineer Procure Construct (EPC) contract for the design and installation of a power performance met mast for the West of Duddon Sands Offshore Wind Farm for ScottishPower Renewables and DONG Energy. The power performance met mast will record weather data to support the construction and operation phases of the wind […]

  • 3 April 2023
    Business development, Technology

    Last week, three months after it was installed at the National Test Center for large wind turbines in Østerild, Denmark, Vestas’s V236-15.0 MW prototype wind turbine reached its nominal power rating of 15 MW. The company’s new flagship wind turbine produced its first electricity shortly after being installed in December 2022 and has started operating at […]

  • 16 November 2022
    Authorities, Contracts & Tenders, Wind Farm Update

    The Lithuanian government has approved amendments to the Renewable Energy and Electricity Laws which define the tender conditions for the development of a second offshore wind farm of up to 700 MW in the Baltic Sea. If the amendments approved by the government are approved by the Seimas (Parliament), they should enter into force on […]

  • 10 October 2022
    Authorities, Business & Finance, Environment

    The Crown Estate has refined the “Areas of Search” for the development of floating offshore wind in the Celtic Sea, as part of the work toward holding a seabed leasing round for 4 GW of floating wind next year. Following the announcement in July of five broad “Areas of Search”, the Crown Estate has now […]

  • 15 April 2021
    Authorities

    Irish Government is working on a new maritime planning bill that would remove the regulative and administrative challenges present under the current act and allow for faster realisation of offshore wind projects. The Maritime Area Planning (MAP) Bill will also establish a new agency, the Maritime Area Regulatory Authority (MARA), to regulate development in Ireland’s Maritime […]

  • 22 December 2022
    R&D, Technology

    The full blade set for the Vestas V236-15.0 MW™ prototype offshore wind turbine has arrived to Østerild National Test Centre in Denmark where they will be installed. The blade set arrived at the port of Hanstholm on Sunday, 18 December, and was then transported to Østerild National Test Centre. The 115.5-metre blades for the prototype […]

  • 26 December 2014

    Pontoon loaded with offshore wind turbine parts sinks off Germany A pontoon loaded with parts for offshore wind turbines sank on Wednesday morning (August 13) in the Baltic Sea. The 35×11 meters large transporting pontoon sprung a leak while being towed from Stralsund towards Kiel by Bösch tug, and sank almost four kilometers northwest of […]

  • 23 December 2021
    Contracts & Tenders, Wind Farm Update

    CSBC-DEME Wind Engineering (CDWE) has selected South Korea’s Samkang M&T to manufacture and deliver the jacket foundations for the Hai Long 2b and Hai Long 3 offshore wind farms in Taiwan. Under the Exclusivity Capacity Agreement (ECA), Samkang M&T will produce and deliver a total of 52 jacket foundations for the two wind farms. The […]

  • 23 October 2020
    Business & Finance

    Vineyard Wind has submitted bids to develop its Liberty Wind offshore wind project in New York in response to the state’s second offshore wind solicitation. Iberdrola, parent company of Avangrid Renewables which is the 50% owner of Vineyard Wind, announced its participation in New York’s second offshore wind solicitation on 20 October. The proposals include […]

  • 18 February 2016
    Business & Finance

    In its preliminary results for 2015 published today, Centrica confirmed the implementation of its strategy is on track, including exiting wind power generation, following the recent disposal of the Lynn and Inner Dowsing offshore wind farms, and the Glens of Foudland wind farm on land. The company reported that divestment proceeds contributed to lowering its net debt by 9%. As part of its divestment programme, the […]

  • 24 November 2016
    Business & Finance

    Triton, a private equity investment company, will become the largest shareholder of DeepOcean, after the funds advised by Triton signed an agreement to acquire a majority interest in the subsea services provider. The transaction is expected to close around 1 January 2017, subject to regulatory approval in the relevant jurisdictions. The parties have agreed not to disclose the […]

  • 3 February 2015
    Business & Finance, Grid Connection

    TenneT TSO GmbH has invited tenders for offshore wind farm services as part of authorisation for planning approval process, divided into: engineering, environmental professional planning, and project coordination. The required services throughout the planning approval process for an offshore wind power connection systems comprise 2 phase elements. Phase 1: These services are to be provided […]

  • 6 March 2023
    Authorities, Environment

    The Danish Energy Agency (DEA) has opened a public consultation period to gather ideas for the environmental assessments of the plans for the country’s new offshore wind farms in the North and Baltic Seas. DEA is working on planning for the areas that were last year identified as suitable for the establishment of offshore wind […]

  • 30 December 2022
    R&D

    Vestas’ V236-15.0 MW prototype wind turbine has produced its first kWh after being fully assembled at the Østerild National test centre for large wind turbines in Western Jutland, Denmark. The wind turbine prototype will now undergo an extensive test and verification programme to ensure reliability before full-type certification and serial production begins. The prototype development […]

  • 14 May 2014
    Business & Finance

    The E.ON Group’s businesses performed as anticipated in the first quarter of 2014. Owing to a continued difficult business and regulatory environment and in the wake of divestments, E.ON’s EBITDA declined by 12 percent year on year to €3.2 billion, its underlying net income by 13 percent to €1.2 billion. By contrast, operating cash flow […]

  • 26 August 2019
    Contracts & Tenders

    Vineyard Wind has submitted a set of commercial large- scale offshore wind proposals to Massachusetts Electric Distribution Companies (EDCs) as part of the state’s second Request for Proposals (RFP). The proposals include a required 400MW option and two options for the development of an 800MW project. “Vineyard Wind is very excited to submit these proposals, […]