952 results found for 'triton'

952 results found for 'triton'
Order results by

A list of search results

  • 26 August 2013
    Grid Connection, Wind Farm Update

    The centerpiece for the transport of wind power to be produced by Windreich’s offshore wind farm MEG 1 has been successfully constructed. “With the construction of the transformer platform ‘DolWin alpha’, 13 kilometers southeast from Windreich’s  MEG 1 wind farm, we have taken a big step forward with the planned construction of the wind farm,” […]

  • 10 June 2011

    The development of Forewind’s first offshore wind farm, known as Dogger Bank Project One, takes another step forward today with the announcement that the cable connecting the proposed wind farm to the national grid at Creyke Beck, in East Riding of Yorkshire, will come to shore between Fraisthorpe and Ulrome on the Holderness coast. Forewind, […]

  • 30 May 2022
    Vessels, Wind Farm Update

    The installation of 28 XXL monopiles for 27 wind turbines and one substation of the Arcadis Ost 1 offshore wind farm is about to begin as DEME Offshore’s installation vessel Orion has arrived at the Port of Roenne, the project’s storage and marshaling port. According to available AIS data, Orion arrived at the port this […]

  • 2 December 2014
    Grid Connection

    National Grid Nemo Link Limited has welcomed Ofgem’s decision on regulatory regime for the proposed Nemo Link interconnector between UK and Belgium. The project is being jointly developed by UK National Grid and Elia, the Belgian transmission system operator and would be the first electricity link between the two countries. Alan Foster, European Business Development Director, […]

  • 19 May 2011

      Alstom, one of the largest multi-source energy companies in the world (traditional and green) has just confirmed to DAVI (the largest plate roll manufacturer in the world) an order for a new, high capacity four- roll plate roll, to build new plants, safer and with no environmental impact. “We have been the first and […]

  • 28 June 2012

    Hantong Group and a German design company recently has singed a contract in Hamburg for co-operating designing the offshore foundation transportation vessel (hereunder referred as OFTV), to secure the smooth delivery of Hantong manufactured offshore foundations in time. The design would be optimized on the basis of original design and more importantly, the OFTV would […]

  • 22 November 2012
    Wind Farm Update

    In just 16 days, during the second visit to the Global Tech I construction site, three more foundations were installed. The installation vessel INNOVATION proved to be extremely reliable in installation of the tripod foundations in 40 meters water depth. Arjen Schampers, Technical Director of Global Tech I Offshore Wind GmbH stated: “We are proud […]

  • 5 March 2018
    Grid Connection, Operations & Maintenance, Wind Farm Update

    EDS HV Group has completed cable termination and testing works at the 400MW Rampion offshore wind farm located off Sussex, UK.

  • 26 November 2021
    Business & Finance, R&D, Technology

    Danish company Floating Power Plant (FPP) has signed an agreement with the Oceanic Platform of the Canary Islands (PLOCAN) to test its multi-megawatt hybrid floating wind and wave energy platform off the coast of Gran Canaria. The contract will enable FPP to deploy its hybrid offshore renewable energy platform in a designated area to the […]

  • 27 January 2022
    Technology

    Gazelle Wind Power has signed a memorandum of understanding (MOU) with Bridon-Bekaert Ropes Group (BBRG) for the supply of mooring lines for the dynamic mooring system of its 2 MW pilot floating wind project at the Oceanic Platform of the Canary Islands (PLOCAN). Dublin-based Gazelle has developed a hybrid floating wind platform with a dynamic […]

  • 11 July 2017
    R&D, Technology, Wind Farm Update

    Vietnam-headquartered Titan Technologies Corporation has ordered two Fraunhofer IWES LiDAR measuring buoys for the surveying of the Zhangpu and Changle offshore wind farms in China.

  • 21 December 2023
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    Vattenfall has signed agreements with Vestas for three large-scale offshore wind projects in the Norfolk Zone, UK, where the developer plans to use the new V236-15 MW wind turbines. This marks a switch in the wind turbine model planned for the projects as the developer first named Siemens Gamesa as the preferred supplier in 2021. […]

  • 4 April 2013
    Contracts & Tenders, Grid Connection

    DC Netz BorWin3 GmbH is inviting tenders for offshore electrical distribution related to BorWin3. The invited tenders are for transmission system of electric power (approximately 900 MW) between the offshore wind farms in the cluster BorWin and a grid connection point on land. In particular, the transmission power, the losses, the availability and compliance with […]

  • 16 April 2021
    Wind Farm Update

    The first batch of foundation components for the Saint-Brieuc offshore wind project has arrived from France to Navantia’s Fene shipyard in Spain for final assembly. The vessel BBC Belem left the port of Brest, France, on 2 April carrying the components for two jacket foundations set to be installed at the French 496 MW project. […]

  • 25 December 2019
    Contracts & Tenders

    Trianel Windkraftwerk Borkum has opened a tender seeking CPS retrofit and bolt exchange services for the Trianel Windpark Borkum offshore wind project. The awarded company will be in charge of subsea works on CPS retrofits and subsea bolt exchanges at diffusor plates, i.e. steel plate under the central column of the tripod foundation. The scope […]

  • 11 February 2014

    After shutting down the gas-fired power plant in Morro Bay, Dynegy is considering an option of using the site to harness energy from the ocean, writes the Tribune. The power plant, which was operating since 1950s, was closed as it was not generating revenue. Now the Huston-based utility company is “looking into whether the technology […]

  • 11 February 2022
    Vessels

    The US crew transfer vessel (CTV) owner and operator American Offshore Services (A-O-S) has entered into a strategic partnership with Orion Infrastructure Capital to build what are said to be “state-of-the-art CTVs designed to transport technicians and materials in varied offshore conditions”. Under the arrangement, Orion will provide financing to build a series of CTVs […]

  • 23 April 2015
    Technology

    FMGC, the European company specialised in cast iron counterweights and ballast solutions, cooperated with Sabella in production of its tidal turbine. In June, the first Sabella D10 will be immersed in the waters of the Fromveur strait near Ushant (French: Ouessant) in Brittany. The foundry manufactured a new type of tidal turbine ballast for the […]

  • 18 November 2015
    Business & Finance, R&D, Technology

    The European Wind Energy Association (EWEA) today plays host to panelists who are discussing business models to provide wind energy directly to corporate clients. The session, titled Wind Energy Turning Blue Chip Companies Green, is organized as part of EWEA’a annual conference held in Paris this year, and will be moderated by Dominique Pialot of […]

  • 3 May 2012

    The annual Arklow & District Chamber Gala Dinner was held on Friday 27th April, with special guest Minister for Jobs, Enterprise & Innovation Richard Bruton. The Chamber celebrated 75 years in existence with a special “Then & Now” award to acknowledge some of the oldest and most successful companies in the town. This prestigious award […]

  • 9 June 2022
    Wind Farm Update

    DEME Offshore’s installation vessel Orion has installed the first of 28 monopile foundations at the Arcadis Ost 1 offshore wind farm in the German Baltic Sea. Manufactured by Steelwind in Germany, the foundation will carry the wind farm’s substation. It has a length of 110 metres, a diameter of 9.5 metres, and a weight of […]

  • 19 June 2023
    Wind Farm Update

    The Navantia-Windar consortium has started shipping the remaining jacket foundations for the French Saint-Brieuc offshore wind farm, being built by Iberdrola through its wholly-owned subsidiary Ailes Marines in the Bay of Saint-Brieuc in Brittany. Each batch will comprise four jackets of the 38 that are still in the Navantia Seanergies Fene shipyard. All 62 foundations […]

  • 13 February 2014
    Business & Finance, Operations & Maintenance

    Innovation, a heavy-lift jack-up vessel owned by HGO InfraSea Solutions, has been working at the UK’s Westermost Rough offshore wind farm as of January 2014, the owner informed on its official website. For this project, the Innovation is managed by GeoSea, which holds 50% shares in HGO. The contract, signed last year between GeoSea and […]

  • 28 March 2014
    Business & Finance, R&D, Technology

    Scandinavian Private Equity investor EQT Mid Market has acquired majority (57,5%) in INTPOW partner StormGeo, a leading global provider of software-based decision support for weather sensitive operations at sea. The Strategy is to support StormGeo’s continued growth. As part of the transaction, EQT Mid Market will enter into a partnership with DNV GL, management and […]

  • 28 November 2016
    Authorities, Business & Finance, Environment, Ports & Logistics, R&D

    In a random sampling of public opinion taken by the Forum Poll among 1,184 Ontario voters, over one half, or 52%, favour offshore wind farms. 26% of the voters polled disapprove offshore wind farms and 22% do not have an opinion on the matter. The poll has also shown that almost two thirds (65%) of […]

  • 30 August 2012

    DONG Energy will be welding a massive pipe on the Jaywick beach which will be used to install subsea cables for connection of the two offshore wind turbines to a power station. This is making Jaywick residents angry, because the construction work will take over the beach at the summer’s peak. The company will use […]