66 results found for 'Dieppe Le Tréport'

66 results found for 'Dieppe Le Tréport'
Order results by

A list of search results

  • 30 March 2022
    Business & Finance

    Siemens Gamesa’s manufacturing facility in Le Havre, France, has started producing both the company’s offshore Direct Drive wind turbine nacelles and IntegralBlades, making it the world’s first facility to encompass the production of both under one roof, according to Siemens Gamesa. The first nacelles and blades produced at the new factory are headed for the […]

  • 6 March 2017
    Authorities, Business & Finance, Contracts & Tenders, Wind Farm Update

    Engie and EDP Renewables (EDPR) have jointly submitted a pre-qualification bid to construct a wind farm with a capacity between 250MW and 750MW off the coast of Dunkirk in France. The bid is part of a competitive dialogue procedure in France’s third round of tenders to select potential developers and define an area best suited for development […]

  • 21 June 2018
    Authorities, Business & Finance, Contracts & Tenders, Jobs & Recruitment, Wind Farm Update

    Developers behind the six French offshore wind projects for which the feed-in tariffs were recently re-negotiated have welcomed the confirmation that the projects are now ready to move forward.

  • 6 April 2017
    Wind Farm Update

    Danish design and consultancy company LICengineering A/S has been selected by Éoliennes en Mer Dieppe et Le Tréport to review and supervise pile test campaign for the 496MW Le Treport offshore wind farm.

  • 29 January 2018
    Contracts & Tenders, Grid Connection, Operations & Maintenance, R&D, Wind Farm Update

    KCI The Engineers is supporting Tractebel at the Dieppe et Le Tréport and Iles d’Yeu et de Noirmoutier offshore wind farms in France by providing the structural know-how to the engineering team for the offshore substations. KCI’s scope will be to assist by setting up the engineering packages for the OSS topsides and foundations from […]

  • 24 August 2017
    Wind Farm Update

    ODE and DORIS Engineering, both part of the DORIS Group, have been awarded Owners Engineer contracts covering the wind turbine generator installation and the marine construction management for the Éoliennes en mer Dieppe et Le Tréport and the Iles d’Yeu et de Noirmoutier wind farms off France.

  • 12 January 2012

    The two Northern French ports of Le Havre and Dieppe are in line for an industry injection that can bring new 21 st century technology into their traditional maritime economies. Offshore wind energy is about to arrive on their doorsteps, bringing with it the complete supply chain for manufacturing, installation, operation and maintenance. Within the […]

  • 18 December 2018
    Business & Finance, Contracts & Tenders

    Engie and EDP Renewables have entered into an alliance with the Japan-based Sumitomo Corporation for the development of the Dieppe et Le Tréport and Iles d’Yeu et de Noirmoutier offshore wind projects in France.

  • 9 March 2018
    Business & Finance

    Subsea 7 is bidding on a tender to provide and install foundations for the Dieppe et Le Tréport and Iles d’Yeu et de Noirmoutier offshore wind farms in France.

  • 29 November 2013
    Business & Finance, Wind Farm Update

    GDF SUEZ, EDP Renewables, Neoen Marine, and AREVA today submitted their proposals to the French Government for the installation and operation of 1,000 MW of offshore wind energy off Le Tréport and between the islands of Yeu and Noirmoutier. The consortium wants to develop its projects through a powerful and sustainable local industrial sector in […]

  • 9 January 2014
    Authorities, Business & Finance

    During a meeting with economic and political stakeholders in the French regions of Haute-Normandie and Picardie, GDF SUEZ, EDP Renewables, Neoen Marine and AREVA have reaffirmed their ambitions to develop innovative, concerted and local environmentally friendly offshore wind projects at the sites of Le Tréport (Haute-Normandie – 500 MW) and the islands of Yeu and […]

  • 2 November 2017
    Contracts & Tenders, Operations & Maintenance, Wind Farm Update

    Danish consulting engineering company Niras has won a contract to set up a plan for decommissioning of two offshore wind projects in France with a combined capacity of nearly 1GW which are still avaiting final investment decision.

  • 13 January 2012

    The last major economy in Europe that is not a member of the offshore wind club is due to knock on the clubhouse door this year. France will be joining the club with a huge 3GW enrolment fee. This month, to be precise, 11 January 2012, was the deadline for the tenders to be submitted […]

  • 6 August 2012

    In April 2012 the French Government under President Sarkozy announced the results of the first round for offshore wind energy licences. Companies and consortia had been invited to tender for the licences following the terms and conditions set out by the Commission of Energy Regulation (CRE). The tenders were for a total maximum power of […]