103 results found for 'hollandse kust beta'

103 results found for 'hollandse kust beta'
Order results by

A list of search results

  • 9 March 2020
    Grid Connection, Technology

    Van Oord is conducting final tests with its Deep Dig-It trencher before the installation of cables at the Hollandse Kust (South) offshore wind farm zone. Van Oord is conducting final tests with the Tracked Remotely Operated Vehicle (TROV) in the Alexiahaven harbor, the Netherlands, in preparation for the actual installation of the sea cables in […]

  • 12 November 2021
    Grid Connection, Wind Farm Update

    The jacket foundation for the Hollandse Kust (noord) offshore substation has been installed off the northern coast of the Netherlands, TenneT said. The topside for this 700 MW offshore substation is scheduled to be installed in May 2022, the transmission system operator said. After departing from the port of Vlissingen, the jacket arrived at its […]

  • 26 June 2020
    Contracts & Tenders, Grid Connection

    TenneT TSO B.V. has awarded Next Geosolutions with a contract to carry out cable route surveys on three wind zones in the Dutch North Sea. The transmission system operator has also signed a backup agreement with Fugro for the work. Under the agreement, Next Geosolutions will carry out cable route surveys on the 700 MW […]

  • 14 September 2018
    Contracts & Tenders, Grid Connection

    Dutch offshore grid operator TenneT TSO B.V. has issued a call for competition for the construction, transport and installation of an offshore platform for a Hollandse Kust offshore wind zone.

  • 20 April 2020
    Grid Connection

    TenneT has opened market consultation on subsea cabling for the projects Hollandse Kust (west) Beta and Ten Noorden van de Waddeneilanden.

  • 7 September 2020
    Grid Connection, Vessels, Wind Farm Update

    Heerema Marine Contractors’ semi-submersible crane vessel Sleipnir has installed the six-legged jacket foundation for TenneT’s Hollandse Kust Zuid Alpha offshore substation. Sleipnir transported the jacket to the installation site in the Dutch North Sea and lowered it into position over the weekend. Built by Eversendai Offshore, the jacket foundation will support the 700 MW topside […]

  • 28 August 2020
    Grid Connection

    The jacket foundation and pin piles for the Hollandse Kust Zuid (HKZ) Alpha platform have arrived from the United Arab Emirates to the Netherlands. According to Petrofac’s post on social media, the 3,200-tonne jacket is currently off the coast of Scheveningen, waiting for Heerema Marine Contractors’ semi-submersible crane vessel (SSCV) Sleipnir to place it at […]

  • 22 September 2015
    Contracts & Tenders, Grid Connection

    Transmission system operator (TSO) Tennet has developed a procurement strategy aiming to involve all future suppliers in connecting future Dutch offshore wind farms to the grid. Under the document, the companies will be able to qualify to take part in future tenders for five wind connection projects offshore Dutch coast. The strategy is based upon […]

  • 25 February 2020
    Grid Connection, Wind Farm Update

    Fugro has completed a marine unexploded ordnance (UXO) risk mitigation project for TenneT as part of the construction of the Hollandse Kust (zuid) offshore wind farm. The 13-month project involved surveying the cable route for explosive remnants of war (ERW), including munitions dumped at sea after conflict, and investigating potential targets. TenneT received their final […]

  • 23 September 2020
    Grid Connection, Wind Farm Update

    Van Oord has started installing the export cables which will connect the 1.5 GW Hollandse Kust (zuid) offshore wind farm to the Dutch grid, TenneT said. For the first ten kilometres of the cable route at sea, the four export cables will have to be buried more than 5,5 metres into the seabed in order […]

  • 8 November 2016
    Grid Connection

    TenneT has signed framework agreements with Royal Smit Transformers and Siemens for the delivery of components for the Dutch offshore grid in the North Sea. Under the contracts, Royal Smit Transformers will supply reactive current compensation coils for the transformer station on land and Siemens will deliver reactive current compensation coils for the offshore transformer station as well […]

  • 29 October 2020
    Contracts & Tenders, Wind Farm Update

    Offshore marine and engineering consultancy company Waves Group has won the Marine Warranty Surveyor (MWS) contract on the 1.5 GW Hollandse Kust Zuid wind farm in the Dutch North Sea. Owned and developed by Vattenfall, the wind farm will comprise 140 Siemens Gamesa 11 MW wind turbines which will be connected to two 700 MW […]

  • 22 October 2019
    Contracts & Tenders, Grid Connection

    TenneT TSO has issued a tender seeking a certifying authority for the Hollandse Kust Noord, Hollandse Kust West Alpha and Hollandse Kust West Beta platforms. The tender concerns the certification of the three platforms, each comprising a 700MW AC offshore substation, primary for the execution phase of the project. TenneT said it has, in-house, developed a […]

  • 28 June 2021
    Grid Connection, Vessels, Wind Farm Update

    Heerema Marine Contractors’ heavy lift vessel Sleipnir has installed the second offshore substation jacket foundation at the Hollandse Kust Zuid wind farm offshore the Netherlands. Located 22 kilometres off the Netherlands coast, the 2,852-tonne jacket will support TenneT’s 700 MW Hollandse Kust Zuid Beta transformer platform which will be ready for use in 2022. Marco […]

  • 10 July 2018
    Contracts & Tenders, Grid Connection

    Petrofac has won a contract by TenneT for the offshore grid connection at the Hollandse Kust Zuid wind farm zone.

  • 15 May 2019
    Contracts & Tenders, Grid Connection

    Heerema Marine Contractors has won a contract by Petrofac for the transport and installation of the Alpha platform at the Hollandse Kust Zuid offshore wind farm zone. Heerema will perform the installation by one of its newest vessels, the semi-submersible crane vessel Sleipnir. According to the company, during the tender preparations the feasibility of the […]

  • 20 June 2023
    Wind Farm Update

    The 759 MW Hollandse Kust Noord offshore wind farm has produced its first green power and delivered it via TenneT’s offshore grid to the Dutch mainland. “We often talk about milestones along a project’s journey, and CrossWind has had a number to date, but to have the wind turbines generating green electricity safely and successfully […]

  • 8 February 2018
    Business & Finance, Contracts & Tenders, Grid Connection

    Dutch transmission system operator TenneT TSO has invited certifying authorities to submit their bids for the certification for the execution phase of the Alpha and the Beta offshore substation projects in the Hollandse Kust (zuid) zone, and the pre-contract award phase of the Hollandse Kust (noord) project.

  • 1 February 2022
    Vessels

    After a day of adventure on the high seas off the Dutch coast, which included hitting a foundation of an offshore wind farm substation, the rudderless cargo vessel Julietta D has been salvaged by Boskalis, the company reported on 1 February, saying the out-of-control ship is now being towed to the Port of Rotterdam. The […]

  • 1 June 2020
    Grid Connection

    The project team working on the jacket foundation for the Hollandse Kust Zuid Alpha offshore substation has completed all the major lifts for the jacket, Petrofac said. The jacket is now getting ready to depart the United Arab Emirates and head to the Dutch North Sea. In September 2019, Eversendai Offshore cut the first steel […]

  • 28 December 2021
    Grid Connection, Vessels, Wind Farm Update

    The topside of the Hollandse Kust (zuid) Alpha (HKZ Alpha) offshore substation has been installed on its jacket foundation in the Dutch North Sea, some 20 kilometres off the coast of The Hague. HKZ Alpha is one of the two 700 MW offshore substations that TenneT ordered at Petrofac and that will connect the 1.5 […]

  • 11 June 2021
    Grid Connection

    TenneT and the joint venture of ENGIE Solutions and Iemants have cut the first steel for the Hollandse Kust (west Alpha) offshore transformer station topside. The joint venture partners and TenneT officially kicked off the steel fabrication for the Hollandse Kust (west Alpha) topside at the Smulders’ facility in Hoboken, Belgium. Smulders is the parent […]

  • 6 September 2023
    Fixed-Bottom, Grid Connection, Offshore Platforms

    The topside for TenneT’s Hollandse Kust West Alpha offshore substation has left Equans fabrication yard in Hoboken, Belgium, and is on its way to its final destination in the Dutch North Sea. The offshore transformer platform is being constructed by a joint venture between Iemants, a subsidiary of Smulders, and Equans (formerly known as ENGIE), […]

  • 7 December 2021
    Grid Connection, Wind Farm Update

    The onshore substation for the 1.5 GW Hollandse Kust Zuid (HKZ) offshore wind farm in the Netherlands has been fully built and put into operation. The 220kV/380kV transformer station, built by Volker Energy Solutions, together with TenneT, is located next to the Euromax terminal in Maasvlakte. Developed by Vattenfall, the wind farm will be connected […]

  • 24 August 2022
    Vessels, Wind Farm Update

    DEME’s vessel Orion has completed the installation of the jacket foundation for Tennet’s Hollandse Kust West Alpha platform in the North Sea off the Dutch coast. The installation of the 2,300-tonne jacket began last week after the unit arrived at the offshore construction site from the Port of Vlissingen on 14 August, a few weeks […]

  • 4 March 2021
    Contracts & Tenders, Grid Connection, Wind Farm Update

    CrossWind, a consortium of Shell and Eneco, has signed agreements with TenneT for the construction of the offshore grid connection for the Hollandse Kust (noord) wind farm. Located in the Dutch North Sea some some 18.5 kilometres off Egmond aan Zee, the 759 MW Hollandse Kust (noord) and its grid connection are scheduled to be […]