9663 results found for 'waterkant'

9663 results found for 'waterkant'
Order results by

A list of search results

  • 16 August 2011

      China Ming Yang Wind Power Group Limited (“Ming Yang” or the “Company”), a leading wind turbine manufacturer in China, today announced its unaudited financial results for the second quarter ended June 30, 2011.  Second Quarter 2011 Financial Highlights:  Total wind turbine generators (“WTGs”) commissioned amounted to an equivalent wind power projects output of 367.5MW, […]

  • 9 March 2011
    Business & Finance

    China Ming Yang Wind Power Group Limited (“Ming Yang” or the “Company”) (NYSE: MY), a leading wind turbine manufacturer in China, today announced its unaudited financial results for the fourth quarter and full year ended December 31, 2010. Fourth Quarter 2010 Financial Highlights * Total wind turbine generators (“WTGs”) commissioned reached a historical high of […]

  • 30 March 2023
    Business development, Research & Development, Technology, Vessels

    Written by David Matthews, Head of Strategy Clarksons Renewables Clarksons sets out today’s reality if the Wind sector is to achieve its ambitious targets for tomorrow Countries around the world have set ambitious targets around Wind energy production for 2030. But with Wind booming and Oil & Gas back in a big way – does […]

  • 25 July 2011

    Best practices for creating wind developments in the Great Lakes region are identified in a report that’s been in the making for more than a year and was just released earlier this week. The Great Lakes Wind Collaborative (GLWC) — which is a public/private coalition of interests advancing sustainable wind energy development within the Great […]

  • 25 July 2011
    Grid Connection

    Reportlinker.com announces that a new market research report is available in its catalogue  HVDC and HVAC Submarine Power Cables: Supply Constraints, Demand Drivers, Technology Issues, Prominent Projects, Key Industry Players, and Global Market Forecasts The high-voltage submarine cable market is, by all definitions, a niche market with few purchasers and even fewer manufacturers and installers. […]

  • 11 May 2012
    Business & Finance, Grid Connection

    The Board of Directors of Prysmian S.p.A. has approved the Group’s consolidated results for the first quarter of 2012 (which are not subject to audit). ” The integration with Draka has led to a significant growth in size – comments CEO Valerio Battista -, allowing sales to be better distributed geographically and the range of […]

  • 19 August 2010
    Business & Finance

    All-time high order intake. Results in line with expectations. Full-year guidance revised downwards. The second-quarter wind energy order intake was 3,031 MW, which was the highest level ever recorded and on a level with the order intake for the whole of 2009. Vestas generated second-quarter revenue of EUR 1,007m, a drop of 17 per cent […]

  • 14 August 2012

    The offshore wind industry is very much dictated by large conglomerates. How is it for smaller companies to keep on their feet in this competitive environment when the stakes are not particular in their favour? Offshore WIND visited family-run towage and salvage company Otto Wulf GmbH and heard how the fourth generation Wulf is running […]

  • 17 October 2011

      Wind turbines operating in Spain show important seasonal behavior. Total electricity generated by wind power was more than 42,702 GWh. The promotion of renewable energies has been a stable national policy for several years. All political parties have similar policies regarding support of renewable energies. The main tools within this policy at a national […]

  • 30 November 2022

    18:00 It’s a wrap Thanks to all participants, partners, sponsors and media partners for making this event such a great success! See you next year on 28 & 29 November 2023! 17:30 Drinks at Navingo stand Offshore Energy Exhibition & Conference is almost coming to an end. The best way to celebrate these two days […]

  • 28 July 2011
    Business & Finance

    Operating and financial overview: *On track to deliver full year earnings growth in 2011, despite commodity price volatility, challenging economic environment and higher UK upstream gas and oil tax rates *shift in profits from the downstream to the upstream *UK residential energy operating profit* halved from the exceptional levels recorded in 2010 *progress in challenging […]

  • 19 April 2010
    Wind Farm Update

    Give birth to our nation’s dreams of clean, plentiful electricity from the wind here, in the offshore waters of Saginaw Bay.

  • 9 March 2010
    Wind Farm Update

    But fishermen soon may be forced to share those waters with even larger structures built to capture the gulf’s other abundant resource: the wind.

  • 3 October 2014

    Year of build: 2012  Design: Heavy-lift jack-up vessel, self-propelled  LOA: 147.50m  Gross tonnage:   Deck area:  3400m² Variable Load: max 8,000t  Max water depth: Up to 65.00m (with leg extension)  Crane type: Liebherr-Werk Nenzing GmbH, CAL 64000-1500 Litronic®  Max lifting capacity: 1,500t @ 31.5m  Accommodation details: 100 person (incl. crew)  Helideck: ø20.88m suitable for Sikorsky […]

  • 30 May 2017

    By deploying fast, high performance vessels for this purpose, they are able to operate very competitively. The vessels are equipped to gather data at a speed of no less than 20 knots, with a maximum wave height of 3.50 metres. Special depth measurements are done allowing clients to effectively manage working processes like dredging-, port-and-water-way-maintenance […]

  • 3 October 2014

    Year of build:   Design: LOA: Gross tonnage: Deck area:   Variable Load: Max water depth:   Crane type: Max lifting capacity: Accommodation details:   Helideck: Service speed:

  • 3 October 2014

    Year of build: due 2013  Design:   LOA: 136.5m  Gross tonnage:   Deck area: 3,400m²  Variable Load: up to 6,000t  Max water depth: 50m  Crane type: Liebherr CAL 45000 1200 Litronic  Max lifting capacity: 1,200t @ 27.5m  Accommodation details: 90  Helideck: Yes  Service speed: 10 knots 

  • 3 October 2014

    Year of build: 2008  Design: Gusto SEA 2000  LOA: 59.9m  Gross tonnage:   Deck area: 1,080m²  Variable Load: 1,400t  Max water depth: 78.85m  Crane type: Liebherr LR1800  Max lifting capacity: 400t at14.9m  Accommodation details: 12 + 40 persons  Helideck: n/a  Service speed: n/a 

  • 3 October 2014

    Year of build: 2010  Design: Gusto NG2500X  LOA: 76m  Gross tonnage: 5,087  Deck area: 1035m²  Variable Load: 1,600t  Max water depth: 65m  Crane type: Huisman PMOC  Max lifting capacity: 300t  Accommodation details: 106 persons in single and double ensuite berths.   Helideck: ø19.5m, CAP 437  Service speed: 8 knots 

  • 3 October 2014

    Year of build: 2012 Design: KFELS MPSEP LOA: 151m Gross tonnage: 23,805t Deck area: 3,750m² Variable Load: 7,000t Max water depth: 65m Crane type: Max lifting capacity: 1,200t Accommodation details: 150 persons Helideck: yes Service speed: 8 – 10 knots

  • 3 October 2014

    Year of build: 2012  Design: Gusto SEA 2500  LOA: 60m  Gross tonnage:   Deck area: 1,600m²   Variable Load: 1,600t  Max water depth: 80m  Crane type: Huisman  Max lifting capacity: 600t at 26m  Accommodation details: 60 persons  Helideck: n/a  Service speed: n/a 

  • 3 October 2014

    Year of build: 2011  Design: Seabreeze Wartsila & IMS for RWE Innogy  LOA: 100m  Gross tonnage: 11,730t  Deck area:   Variable Load: 15t/m²  Max water depth: up to 45m  Crane type: Liebherr BOS 35000  Max lifting capacity: 1000t at 25m  Accommodation details: 60 persons  Helideck: ø17m  Service speed: 7.5 knots 

  • 3 October 2014

    Year of build: 2003  Design: Self-elevating Offshore Support Unit, Wind Turbine Installation Unit  LOA: 130m  Gross tonnage: 14,310t  Deck area: 3,200m²  Variable Load: 4,875t @ 4.3m draft  Max water depth: 8m  Crane type: Huisman – Pedestal mounted rope luffing electric offshore crane  Max lifting capacity: 600t @ 25m  Accommodation details: 70 berths  Helideck: N/A  Service […]

  • 3 October 2014

    Year of build: 2010  Design: Gusto NG 5300 self elevating crane vessel  LOA: 114.87  Gross tonnage: 7,962t  Deck area: –  Variable Load: 2,000t   Max water depth: 45m  Crane type: GustoMSC GCC-500-HD  Max lifting capacity: 500t at 31m  Accommodation details: 50, 10 x single cabins, 20 x double cabins  Helideck: ø 19m, 9t, suitable for […]

  • 3 October 2014

    Year of build: 2012  Design: Gusto NG-9000c-HPE  LOA: 132m  Gross tonnage: 15,328t  Deck area: 3,200m²   Variable Load: 7,900t Max water depth: 55m  Crane type: Gusto GLC 800 ED (wrap around aft port leg)  Max lifting capacity: 800 at 24m  Accommodation details: 80 persons in 56 cabins  Helideck: ø22m 12.8t max  Service speed: 12 knots 

  • 3 October 2014

    Year of build: 2012  Design: Self-propelled jack-up vessel / Gusto NG-9000  LOA: 132,41m  Gross tonnage: 15,966t  Deck area: 3,350m²  Variable Load: 15t/m²  Max water depth: 45m (dependant on tide and penetration)  Crane type: Gusto GLC-800-ED  Max lifting capacity: 800t at 24m, 600t at 30m (option for 900t with reconfigured boom)  Accommodation details: client: 35 single […]