5655 results found for 'Beacon Wind '

5655 results found for 'Beacon Wind '
Order results by

A list of search results

  • 8 November 2018
    Authorities, Contracts & Tenders, Grid Connection, Operations & Maintenance, Wind Farm Update

    Ofgem has granted a licence to TC Dudgeon OFTO plc to own and operate the GBP 297.9 million high-voltage transmission link to the Dudgeon offshore wind farm for the next 20 years.

  • 22 October 2013

    The world’s largest and most powerful offshore wind turbine is now standing at Energy Park Fife. The Samsung Heavy Industries prototype offshore turbine is due to become operational later this year. The structure is situated 50 metres offshore in the Firth of Forth and the tip of its blades stretch 196 metres above the sea. […]

  • 3 March 2017
    Business & Finance, Operations & Maintenance, Training & Education

    Several businesses, organisations and government bodies in Dutch province of Zeeland have joined forces to found a new company – The Wind Technicians – which will provide offshore employment services.

  • 8 December 2014

    At the start of August developer Cape Wind awarded a contract to Weeks/Manson Joint Venture (WMJV), a joint venture of marine contractor Weeks Marine and heavy civil marine contractor Manson Construction Co., to become lead construction contractor for the 468MW Cape Wind offshore wind farm. Cape Wind is to be located off the coast of […]

  • 22 June 2016
    Grid Connection, Wind Farm Update

    The export cable at the Burbo Bank Extension offshore wind farm has been pulled in.  The cable was floated ashore on pillow floats to a small jack up barge then pulled through the tidal and connected to a winch for the final 760-metre pull through a HDD that had been installed 12 months ago, according […]

  • 9 March 2012
    Authorities

    Energy Minister, Charles Hendry, believes the Tees Valley is a great deal ahead of its opponent site in Scotland in terms of securing a proposed £150m wind farm factory project. Hartlepool and Leith are directly competing to secure the investment from a Spanish firm Gamesa, with a promising potential for creating over 1,000 jobs. Stuart […]

  • 18 December 2020
    Contracts & Tenders, Ports & Logistics

    Siemens Gamesa has awarded Muehlhan Wind Service (MWS) with a lump sum EPC contract for the Kriegers Flak offshore wind farm in Denmark, under which Muehlhan will provide pre-assembly and ground logistics services. The company will be carrying out the complete mechanical and electrical pre-assembly work for 72 wind turbines, including all crane and lifting […]

  • 20 October 2010
    R&D

    The world market for wind turbines saw robust growth in the first half of the year 2010, with approximately 16 Gigawatt of new capacity added worldwide. Again China represents the by far largest market and added 7800 MW within only six months, reaching total installations of almost 34 Gigawatt. The USA, still number one in […]

  • 6 March 2020
    Wind Farm Update

    Underwater investigations have kicked off on Star of the South, Australia’s first offshore wind project. Over two weeks, a crew will complete 24-hour seabed investigations including mapping the seafloor, measuring water depths and identifying buried infrastructure such as cables or shipwrecks. The work is being carried out from Lakes Entrance using the local vessel the […]

  • 3 September 2018
    Business & Finance, Jobs & Recruitment, Operations & Maintenance, Ports & Logistics, Wind Farm Update

    Triton Knoll has agreed a Memorandum of Understanding (MoU) with Associated British Ports (ABP) to use its Grimsby facility as the Triton Knoll wind farm’s long-term Operations and Maintenance (O&M) base.

  • 14 September 2015
    Grid Connection

    Tekmar Energy has won a contract to provide its sixth generation TekLink mechanical latch systems at the Burbo Bank Extension offshore wind farm on the north-west coast of England. Tekmar will provide site operator DONG Energy with 65 systems including one export and nine bellmouths for the 32-turbine, 258MW Liverpool Bay development with Tekmar supplying […]

  • 28 April 2017
    Grid Connection, Operations & Maintenance, Technology

    German energy service provider Clean Energy Sourcing (CLENS) has won a contract to provide TenneT with data on current and forecasted generation on wind farms which will help optimise the transmission system operator’s net and curtailment management.

  • 13 December 2015

    DONG Energy Seeks Technical and Consultancy Staff for Danish Projects DONG Energy has invited tenders for temporary technical and consultancy staff working at the company’s Danish locations. Photo of the Day: Port of Esbjerg’s December Look Offshore WIND’s photo of the day: Sea Challenger loading Gode Wind turbine components at the Port of Esbjerg, while […]

  • 18 April 2017
    Grid Connection, R&D

    The Technical University of Denmark (DTU) is leading a new project that will develop methods to optimise the management of electrical connections and pave the way for an integrated energy system across the Nordic countries. The project, Multi-DC – Innovative Methods for Optimal Operation of Multiple HVDC Connections and Grids, is supported by Grand Solutions Innovation Fund Denmark.

  • 9 October 2019
    Grid Connection, R&D

    EDS HV Group has carried out studies on the grid connection system for the Kincardine floating offshore wind farm in Scotland. Under a contract with Cobra Group, the UK-based company was in charge of power system research which included load flow, short circuit, fault ride through, reactive compensation and operation/contingency studies. “Floating wind is becoming an increasing part of […]

  • 4 April 2017
    Wind Farm Update

    Following the start of construction at the Beatrice offshore wind farm site in the UK, Smulders posted photographs of the upper parts of the jacket foundations the company has been fabricating for the project.

  • 3 December 2013
    Wind Farm Update

    DanTysk offshore wind farm, situated west of the island of Sylt and directly on the German-Danish border, recently shook under the strength of storm “Christian” that swept through the North Sea. Wind measurements of 44.3 m/s (160km/h) were recorded on board the foundation installation vessel – the Seafox 5, at 2:10 pm on October 29, […]

  • 13 February 2012

    The Isle of Man has the potential to be significant in renewable industry as it was mentioned last week at the opening of a £1.2 billion world’s largest wind farm in Barrow-in-Furness. Laurence Skelly, a member of the Department of Economic Development, emphasized the opportunity for the Isle of Man to become a great supplier […]

  • 30 November 2016

    BiFab’s Arnish facility began work on the transition pieces and piles for the Beatrice offshore wind farm in mid-October, increasing the workforce at the site by 71 people, according to SSE. Burntisland Fabrications (BiFab), a Fife based company with facilities at Burntisland, Methil and Arnish, won two multi-million pound contracts with Beatrice Offshore Wind Ltd’s […]

  • 8 March 2016
    Business & Finance

    Of the 96GW of installed renewables capacity subsidized under Germany’s Renewable Energy Law, 34% was connected to E.ON networks at the end of 2015, the company informed. E.ON said its networks in Germany are home to a total of 32GW of renewables capacity, about as much as 100 large offshore wind farms. The most prevalent […]

  • 24 December 2013

    Navitus Bay is to hold a series of drop-in sessions in January 2014, in order to give the public the chance to meet the project team and learn more about the next stage of the project. As the developer works towards submitting its application for planning consent in early 2014, members of the project team […]

  • 7 February 2014
    Wind Farm Update

    The Thornton Bank offshore wind farm, developed by the C-Power consortium, was running at full speed in December and January and produced 24% more energy than expected during those two months thanks to exceptionally favourable wind conditions and high technical reliability of the wind farm. The 54 wind turbines, which are positioned 30 kilometres out […]

  • 10 March 2021
    Ports & Logistics, Wind Farm Update

    Sif Group has completed the first two of the 140 monopiles to be manufactured for Vattenfall’s 1.5 GW Hollandse Kust Zuid 1-4 wind farm. With a combined weight of 115,000 tons, the 140 monopiles are designed in such a manner that they do not require transition pieces. The design is said to allow faster installation […]

  • 4 January 2021
    Wind Farm Update

    Van Oord has started installing inter-array cables at the Windpark Fryslân nearshore wind farm in the IJsselmeer Lake, the Netherlands. The installation work started in December, as planned, a spokesperson for Windpark Fryslân said. The inter-array cables will first come to shore at the wind farm’s own transformer station at Breezanddijk on the artificial island […]

  • 25 September 2020
    Contracts & Tenders, Wind Farm Update

    Fugro Netherlands Marine B.V. has won the contract to carry out a geophysical survey at the proposed Hesselø wind site offshore Denmark. Located in Kattegatt, Hesselø is the second of the three offshore wind farms proposed in Denmark’s Energy Agreement 2018, the first being the Thor project. Both Hesselø and Thor will be commissioned in 2027. Denmark plans […]

  • 26 August 2019
    Business & Finance

    DNV GL Launches US Offshore Wind Certification OfficeDNV GL has established a renewables certification office in the U.S. to meet the demands for offshore wind certification services. DNV GL selected its office in Medford, Massachusetts, as the base for the U.S. Renewables Certification group, due to its proximity to Boston and New York City. The operations […]