offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›REpower Systems AG announces preliminary interim results for Q1 2010/11 (April 1, 2010 – June 30, 2010) (Germany)
Business & Finance

July 27, 2010 · about 16 years ago

REpower Systems AG announces preliminary interim results for Q1 2010/11 (April 1, 2010 – June 30, 2010) (Germany)

Sales EUR 213.1 million, EBIT EUR 1.5 million, order backlog EUR 2.42 billion Hamburg, 27 July 2010. According to initial calculations, REpower Systems Group (Prime Standard, WKN 617 703) generated a total performance of EUR 204.0 million in the first three months of fiscal year 2010/11, compared wi

1 minutes read
  • LinkedIn
  • X
  • Email

Sales EUR 213.1 million, EBIT EUR 1.5 million, order backlog EUR 2.42 billion

Hamburg, 27 July 2010. According to initial calculations, REpower Systems Group (Prime Standard, WKN 617 703) generated a total performance of EUR 204.0 million in the first three months of fiscal year 2010/11, compared with a total performance of EUR 287.1 million in the same period of the previous year. Sales dropped year-on-year from EUR 300.7 million to EUR 213.1 million. Earnings before interest and taxes (EBIT) for the period from April to June 2010 totaled EUR 1.5 million compared with EUR 10.7 million in the previous year.

As of 30 June 2010, the order backlog included purchase agreements having a potential sales volume of approx. EUR 2.42 billion (as of 30 June 2009: approx. EUR 1.45 billion). That means a considerable leap of 67%, whereas especially orders of large scale wind turbines (3 to 6 MW class) increased. The figures exclusively comprise the batches bindingly ordered within the scope of project agreements, as well as on-call orders arising from framework agreements.

Publication of the final results and the complete quarterly report is scheduled for August 13, 2010.

[mappress]

Source: REpower, July 27, 2010;

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & Finance

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Young Oysters Deployed on Two North Sea Cable Crossings
  2. 2Pacifico Energy Unveils EUR 860+ Million Investment in Two Offshore Wind Projects in South Korea
  3. 3Fourth Vard-Built CSOV Joins Windward Offshore Fleet
  4. 4ABS to Support Japanese Company’s 18 MW Floating Wind Turbine Pilot in Brazil

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free