Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Technology›Liftra Presents New Standard in Blade Installation (Denmark)
Technology

December 20, 2011 · about 14 years ago

Liftra Presents New Standard in Blade Installation (Denmark)

Liftra strives to set a new standard in blade installation with the development of the Blade Dragon. The Blade Dragon is a remote controlled yoke that handles blades in wind speeds up to 12 m/s for installation on the hub in all positions. Liftra is recognized by international wind turbine industr

1 minutes read
  • LinkedIn
  • X
  • Email

Liftra strives to set a new standard in blade installation with the development of the Blade Dragon.

The Blade Dragon is a remote controlled yoke that handles blades in wind speeds up to 12 m/s for installation on the hub in all positions.

Liftra is recognized by international wind turbine industry as a professional specialist in lifting and transportation solutions.

[mappress]

Offshore WIND staff, December 20, 2011; Image: liftra

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Technology

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1200th Vestas V236-15.0 MW Wind Turbine Installed Offshore
  2. 2Neptun Werft-Smulders Joint Venture Secures Second 2 GW Converter Platform Contract from 50Hertz
  3. 3First Data from ‘Most Ecological Offshore Wind Farm’ Made Publicly Available
  4. 4EEW SPC to Supply TP-Less Monopiles for First Phase of CIP and Vattenfall’s Zeevonk Project

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free