Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Technology›Installation of First AREVA Turbines Starts at Trianel and Global Tech I (Germany)
Technology

September 24, 2013 · about 13 years ago

Installation of First AREVA Turbines Starts at Trianel and Global Tech I (Germany)

The installation phase of the first AREVA M5000 turbines has begun for the German offshore wind farm Global Tech I and Trianel Windpark Borkum in the North Sea. By 2014, these two parks will host 120 turbines (40 at Trianel Windpark Borkum, 80 at Global Tech I) for an installed capacity of 600 megaw

1 minutes read
  • LinkedIn
  • X
  • Email

The installation phase of the first AREVA M5000 turbines has begun for the German offshore wind farm Global Tech I and Trianel Windpark Borkum in the North Sea.

By 2014, these two parks will host 120 turbines (40 at Trianel Windpark Borkum, 80 at Global Tech I) for an installed capacity of 600 megawatts, providing electricity to around 600,000 households. AREVA’s technology will represent at that point, 33% of the 1800 MW of Germany’s offshore wind installed base.

The Trianel Windpark Borkum, with a 200 MW capacity, is located nearly 45 kilometers off the island of Borkum, near the alpha ventus park where six AREVA turbines have been in operation since 2009. The Global Tech 1 park, with a 400 MW capacity, is located at a distance of 110 kilometers from the German coast, which will constitute a world first.

Louis-Francois Durret, Senior Executive Vice-President of AREVA’s Renewable Energies Business Group , said: “By giving us their confidence, our customers Trianel and Global Tech I, have enabled us to reinforce our key player position on the European offshore wind market and positions us favourably to win future contracts in France and the United Kingdom.”

[mappress]

Press release, September 24, 2013; Image: Areva

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

TechnologyWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Envision Energy Presents 16.7 MW Offshore Wind Turbine in Germany
  2. 2Offshore Wind Farm Featuring 18 MW Turbines Goes Online in China
  3. 3LD Armateurs Welcomes Multipurpose Support Vessel to Its Fleet
  4. 4NYK Line Orders Ulstein-Designed SOV at PaxOcean

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free