offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Technology›Atkins to Design Foundations for Dudgeon OWF
Technology

March 25, 2014 · about 12 years ago

Atkins to Design Foundations for Dudgeon OWF

Atkins has been awarded an engineering contract for the Dudgeon Offshore Wind Farm. The contract will cover all design and engineering services for the monopile foundations for the 6.0 MW turbines as well as management assistance during fabrication and installation. David Parkin, managing director f

1 minutes read
  • LinkedIn
  • X
  • Email

Atkins has been awarded an engineering contract for the Dudgeon Offshore Wind Farm. The contract will cover all design and engineering services for the monopile foundations for the 6.0 MW turbines as well as management assistance during fabrication and installation.

David Parkin, managing director for Atkins’ Renewables business, said: “This contract win further builds on our established position as a leading engineering consultancy in the offshore wind sector. The project plays to our strengths in geotechnical and offshore structural engineering, and we look forward to working with Statoil and Statkraft to deliver the project.”

The engineering activities are already underway and include structure design, structure analysis and drawing production as well as geotechnical engineering. The management assistance part of the contract includes follow up of the fabrication which will commence in 2015.

The Dudgeon Offshore Wind Farm, which will be located 20 miles off the coast of Cromer in North Norfolk, is expected to have an installed capacity of around 400MW. This equates to enough energy to power up to approximately 410,000 homes and reduces emissions of carbon dioxide by up to 19 million tonnes over its 25 year lifetime, providing 0.5 per cent of the UK’s overall annual electricity needs.

The execution of the Dudgeon Offshore Wind Farm project is subject to a final investment decision by its owners in Q3 2014.

Press release, March 25, 2014; Image: dudgeonoffshorewind

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TetraSpar Floater Completes Five-Year Testing Campaign Offshore Norway
  2. 2Standardization and Industrialization Could Cut Offshore Wind Costs in North Sea by 28% - Study
  3. 3Industrialisation, Productivity and Global Competition: What's Next for Blade Manufacturing?
  4. 4Massachusetts Invests USD 4.2 Million to Boost Offshore Wind Workforce and Research

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free