Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›K2 Management Wins Work on 504 MW Offshore Wind Farm in South Korea
Contracts & Tenders

May 19, 2021 · about 5 years ago

K2 Management Wins Work on 504 MW Offshore Wind Farm in South Korea

K2 Management has been selected for design and owner’s engineer services at Taean Wind Power’s 504 MW offshore wind farm in South Korea. The contract follows K2’s Memorandum of Understanding (MoU) with Taean Wind Power and Dohwa Engineering from 2019 and the delivery of a preliminary feasibility stu

1 minutes read
  • LinkedIn
  • X
  • Email
Robin Rigg offshore wind farm in the UK
Illustration; Robin Rigg offshore wind farm; Photo: Arup

K2 Management has been selected for design and owner’s engineer services at Taean Wind Power’s 504 MW offshore wind farm in South Korea.

The contract follows K2’s Memorandum of Understanding (MoU) with Taean Wind Power and Dohwa Engineering from 2019 and the delivery of a preliminary feasibility study and site screening in the initial stages of the development of the project.

In partnership with Dohwa, K2 will now deliver on the next stage of the project, which includes the design of the turbine foundations, inter-array, export cables, and offshore substation.

K2M and Dohwa will also carry out the energy yield assessment and manage the invitation to tender and permitting processes, with the goal of streamlining the project and ensuring it remains on schedule.

Construction of Taean offshore wind farm, located in the Yellow Sea, is scheduled to begin in July 2023, with a completion date of 2026.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Contracts & TendersWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1GS Entec Completes Monopile Factory in Korea
  2. 2PGE and Ørsted Add BGB Group to Baltica 2 Offshore Wind Team
  3. 3Fugro Wins UXO Survey Contract for German Offshore Grid Connections
  4. 4Seaway7 Completes Inter-Array Cable Installation at East Anglia Three Offshore Wind Farm

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free