Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Van Oord Orders Study on Sofia Inter-Array Cable Stability
Business & Finance

May 9, 2022 · about 4 years ago

Van Oord Orders Study on Sofia Inter-Array Cable Stability

Van Oord has contracted Peritus International to perform a study on inter-array cable stability for RWE’s Sofia offshore wind farm in the UK. The scope consists of calculating the on-bottom stability for the inter-array cables in challenging environmental conditions and shallow water. According to P

1 minutes read
  • LinkedIn
  • X
  • Email
Van Oord Orders Study on Sofia Inter-Array Cable Stability
RWE (Illustration)

Van Oord has contracted Peritus International to perform a study on inter-array cable stability for RWE’s Sofia offshore wind farm in the UK.

The scope consists of calculating the on-bottom stability for the inter-array cables in challenging environmental conditions and shallow water.

According to Peritus, the detailed analysis work aims to increase the duration that the cables can be left on the seabed prior to trenching.

Related Articles

Operations & Maintenance

Sofia Offshore Wind Farm Picks Q&I Services Provider

1 min read

Van Oord is the EPCI contractor for the inter-array cables and monopile foundations for the Sofia offshore wind project under a contract won at the beginning of 2021.

The Dutch company earlier this year selected Hellenic Cables for the supply of 66 kV inter-array cables and accessories for the 1.4 GW project.

The export cable will be delivered by Prysmian.

Sofia will feature 100 SG 14-222 DD turbines scheduled to be fully commissioned in 2026. Offshore construction is expected to start in 2023.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Business & FinanceContracts & TendersGrid ConnectionR&DWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Balfour Beatty Wins Contract for Substation to Connect Three Dogger Bank Wind Farms
  2. 2Archer Weighs Sale of Offshore Wind Business After Culzean Project Setbacks
  3. 3Vattenfall Tests New Bird Monitoring Tech at Dutch Offshore Wind Farm
  4. 4IFM Investors to Acquire Majority Stake in UK Port Operator ABP

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free