Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kent Wins Substation Design Contract for RWE’s UK Offshore Wind Farm Extension Project
Business & Finance

October 9, 2024 · about 1 year ago

Kent Wins Substation Design Contract for RWE’s UK Offshore Wind Farm Extension Project

Kent, a global integrated energy services provider, has signed a new contract with Five Estuaries, being led by RWE, for a concept design study of an HVAC offshore substation platform for the offshore wind farm in the UK. Kent’s scope of work comprises conducting the offshore substation topside conc

1 minutes read
  • LinkedIn
  • X
  • Email
Kent Five Estuaries
Source: Kent

Kent, a global integrated energy services provider, has signed a new contract with Five Estuaries, being led by RWE, for a concept design study of an HVAC offshore substation platform for the offshore wind farm in the UK.

Kent’s scope of work comprises conducting the offshore substation topside concept design and support structure foundation assessment and concept design.

The Five Estuaries offshore wind farm is the sister extension project of the existing 353 MW Galloper Wind Farm, located 30 kilometres off the coast of Suffolk.

The first power from the project was generated in November 2017, and it became fully operational in March 2018. Each year, Galloper Wind Farm’s 56 turbines generate enough renewable energy to power the equivalent of more than 444,000 UK homes, according to Kent.

The proposed Five Estuaries offshore wind farm is located about 37 kilometres off the Suffolk/Essex Coast and is planned to be fully operational in 2031.

Five Estuaries is owned by a number of shareholders, with RWE leading the development, construction, and operation.

In April, the UK Planning Inspectorate accepted RWE’s application for the offshore wind project. According to our previous news, the final planning decision for Five Estuaries is expected in the summer of 2025.

Related Articles

Authorities

RWE’s UK Offshore Wind Farm Extension Project Moves Forward

2 min read

LinkedIn X Facebook Google News

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Business & FinanceFixed-BottomGrid ConnectionOffshore Platforms

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1US Gets New Offshore Wind Farm as All Turbines Installed at 704 MW Revolution Wind
  2. 2Vietnam-Made Cable Layer Enters Into Service in Taiwan
  3. 3Germany’s 960 MW He Dreiht Offshore Wind Farm Inaugurated
  4. 4200th Vestas V236-15.0 MW Wind Turbine Installed Offshore

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free