Germany: MMT Conducting Survey for Baltic 2 Offshore Wind Park

Environment

Germany MMT Conducting Survey for Baltic 2 Offshore Wind Park

MMT (Sweden) has been appointed by Siem Offshore Contractors GmbH to conduct a pre lay survey and ROV inspection of the IAG at the Baltic 2 Offshore Wind Park.

This project is now ongoing and MMT uses the survey & ROV vessel IceBeam, equipped with a Kongsberg EM2040 Dual Head Multibeam and a Sub-Atlantic Mohican ROV, to identify boulders that interfere with the proposed inter array grid cable routes. The survey includes a high resolution multibeam survey, app 50 meters wide of the cable route. A target list will be established from the high resolution multibeam data and the targets will subsequently be visually inspected by the ROV.

[mappress]

Press release, March 26, 2013; Image: