Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Training & Education›Safer Crew Transfer with Fishermen’s Energy
Training & Education

August 18, 2015 · about 11 years ago

Safer Crew Transfer with Fishermen’s Energy

Fishermen’s Energy presented the new type of access ladder aiming to increase safety during the crew transfer from boats to wind turbines and vice versa last week. In cooperation with Keystone Engineering, Fishermen’s Energy contracted Gulf Island Fabricators in Houma, Louisiana – the same fabricati

1 minutes read
  • LinkedIn
  • X
  • Email

Fishermen’s Energy presented the new type of access ladder aiming to increase safety during the crew transfer from boats to wind turbines and vice versa last week.

In cooperation with Keystone Engineering, Fishermen’s Energy contracted Gulf Island Fabricators in Houma, Louisiana – the same fabrication yard that built the Block Island Wind Farm foundations – to build a full-scale mock-up of the new ladder.

Representatives from the Bureau of Ocean Energy Management, Occupational Safety and Health Administration (OSHA), U.S. Coast Guard, American Bureau of Shipping, Siemens, and Alstom gathered at Gulf Island Fabricators in Houma, Louisiana to test out the new system first hand.

“Unlike traditional ladder access where the worker steps from the vessel forward across a gap to the ladder, our innovative ladder is rotated 90 degrees so that the vessel deck can be placed as close as possible to the ladder rail and allow the offshore worker to safely side step onto the ladder,” says Stan White, Program Director of Fishermen’s Energy. “If the offshore worker were to accidentally fall, the worker won’t be pinned between the vessel and the ladder but, instead, the worker would fall in a clear space protected by the fender system.”

OffshoreWIND staff; Image: energy

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Training & EducationVessels

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PGE and Ørsted Add BGB Group to Baltica 2 Offshore Wind Team
  2. 2Fugro Wins UXO Survey Contract for German Offshore Grid Connections
  3. 3Seaway7 Completes Inter-Array Cable Installation at East Anglia Three Offshore Wind Farm
  4. 4Crewing SOVs and CTVs: Where Wind Operators Will Find Their Next Crews

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free