Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Grid Connection›JD Contractor Starts Laying Horns Rev C Subsea Cable
Grid Connection

June 6, 2016 · about 10 years ago

JD Contractor Starts Laying Horns Rev C Subsea Cable

Danish national transmission system operator Energinet.dk has started works to install a 33-kilometre subsea cable which will connect the offshore substation at the 400MW Horns Rev 3 offshore wind farm to the power grid on land. JD Contractor’s multipurpose offshore installation vessel Sima will ins

2 minutes read
  • LinkedIn
  • X
  • Email

Danish national transmission system operator Energinet.dk has started works to install a 33-kilometre subsea cable which will connect the offshore substation at the 400MW Horns Rev 3 offshore wind farm to the power grid on land.

JD Contractor’s multipurpose offshore installation vessel Sima will install the 222kV cable from the Horns Rev C substation, to around 1,500 metres from the shore, where another smaller vessel will take over the installation due to waters being too shallow for Sima to carry on.

The smaller vessel will install the cable to around 600 metres from the shore, where the cable will be laid on floating pontoons and pulled ashore.

The entire operation is expected to take 10 days, with the subsea cable reaching the shore on 13 or 14 June.

The subsea cable will be pulled ashore some 1.5 kilometres north of Henne Strand, where it will be linked to an onshore cable via a transition station. The linking of the two cables is expected to take six days.

The onshore cable was installed between the transition station and the onshore substation in Blaabjerg Klitplantag last year.

Swedish energy company Vattenfall is the owner and operator of the Horns Rev 3 OWF, which once commissioned in 2018, will be the largest offshore wind farm in Danish waters. Vattenfall reached the Final Investment Decision on the project last week.

Energinet.dk is the owner of the wind farm’s transmission system.

Offshore Wind Staff

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Grid ConnectionVesselsWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Former RWE Offshore Wind CEO Joins Esvagt Board
  2. 2UK’s First HVDC Subsea Cable Factory Opens in Scotland
  3. 3Diverse Marine to Build Three More CTVs for OEG
  4. 4Offshore Charging, Rare Earth Magnet Projects Secure EU Funding

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free