Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Eager.one to Equip Samkang M&T with Jacket Lifting Tool for Work in Asia
Contracts & Tenders

April 20, 2022 · about 4 years ago

Eager.one to Equip Samkang M&T with Jacket Lifting Tool for Work in Asia

Eager.one has been awarded a contract to design and supply the South Korean offshore wind specialist Samkang M&T with a remote-operated Jacket Lifting Tool (JLT). The JLT will be able to handle jackets of up to 2500 tonnes that will be moved from the yard onto transport vessels. According to the man

1 minutes read
  • LinkedIn
  • X
  • Email
Samkang M&T
Eager.one

Eager.one has been awarded a contract to design and supply the South Korean offshore wind specialist Samkang M&T with a remote-operated Jacket Lifting Tool (JLT).

The JLT will be able to handle jackets of up to 2500 tonnes that will be moved from the yard onto transport vessels.

According to the manufacturer, the JLT will be used for upcoming offshore wind projects in Asia.

This will be Eager.one’s first project for Samkang M&T.

Samkang M&T is currently responsible for manufacturing and delivering a total of 52 jacket foundations for the Hai Long 2b and Hai Long 3 offshore wind farms in Taiwan. The delivery of the jackets is expected to be completed by December 2024.

Related Articles

Contracts & Tenders

Samkang M&T Wins EUR 426 Million Offshore Wind Contract

2 min read

In 2019, Danish offshore wind developer Ørsted signed a contract with Samkang M&T for the supply of 28 jacket foundations for the 900 MW Changhua 1 and 2a offshore wind projects in Taiwan.

Related Articles

Ørsted Orders Changhua Jackets in South Korea
Contracts & Tenders

Ørsted Orders Changhua Jackets in South Korea

1 min read

LinkedIn Twitter Facebook

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Contracts & Tenders

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PGE and Ørsted Add BGB Group to Baltica 2 Offshore Wind Team
  2. 2Fugro Wins UXO Survey Contract for German Offshore Grid Connections
  3. 3Seaway7 Completes Inter-Array Cable Installation at East Anglia Three Offshore Wind Farm
  4. 4Crewing SOVs and CTVs: Where Wind Operators Will Find Their Next Crews

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free