Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Floating Wind›Foundation Fabrication Kicks Off for TotalEnergies’ Culzean Pilot Project
Floating Wind

November 20, 2024 · about 1 year ago

Foundation Fabrication Kicks Off for TotalEnergies’ Culzean Pilot Project

Archer Wind has started the fabrication of the foundation which will be installed as part of the Culzean floating offshore wind pilot project. This single-turbine, 3 MW pilot project, owned and developed by TotalEnergies, will provide power to the Culzean gas platform in the UK North Sea. According

1 minutes read
  • LinkedIn
  • X
  • Email
Archer Wind Culzean First Plate Cut
Source: Archer Wind via LinkedIn

Archer Wind has started the fabrication of the foundation which will be installed as part of the Culzean floating offshore wind pilot project. This single-turbine, 3 MW pilot project, owned and developed by TotalEnergies, will provide power to the Culzean gas platform in the UK North Sea.

According to Archer Wind’s recent social media post , the first plate was cut on 19 November – a moment that signifies the transition from planning and design to tangible progress.

In August, TotalEnergies awarded Archer Wind a contract to deliver the floating foundation for the 3 MW wind turbine.

Earlier this year, Archer took over Moreld Ocean Wind (MOW) and with it a stake in the floating wind technology developer Ocergy, whose foundation will be installed at the Culzean site.

The single floating wind turbine will be located two kilometres west of the Culzean platform and 220 kilometres off the coast of Aberdeen.

The pilot project was selected in Crown Estate Scotland’s Innovation and Targeted Oil & Gas (INTOG) leasing round in 2023.

According to TotalEnergies, once fully operational, the 3 MW floater will cover approximately 20 per cent of Culzean’s needs, in addition to the electricity already generated by gas turbines.

Related Articles

Floating Wind

Archer Wind Orders TP-Products Flange Connector for TotalEnergies’ Pilot Floating Wind Project

2 min read

LinkedIn X Facebook Google News

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Floating WindFoundationsManufacturingProject UpdatesSupply ChainWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1IFM Investors to Acquire Majority Stake in UK Port Operator ABP
  2. 2TenneT and NKT Jointly Explore Offshore Cable Decommissioning
  3. 3GEOxyz Conducting Seabed Survey at East Anglia Two Offshore Wind Site
  4. 4US Gov’t Seeks New Review of US Wind’s Maryland Project

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free