Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Manufacturing

Loading filters...
Contracts & TendersContracts & TendersOffshore PlatformsGrid ConnectionSupply ChainProject UpdatesFoundationsFixed-BottomWind Farm UpdateProject UpdatesBusiness & FinanceBusiness developmentFloating WindResearch & DevelopmentWind TurbinesIndustry
Offshore converter platform render - LanWin platform
Manufacturing

Neptun Werft-Smulders Joint Venture Secures Second 2 GW Converter Platform Contract from 50Hertz

2 days ago
Baltica 2 monopiles by EEW SPC
Manufacturing

EEW SPC to Supply TP-Less Monopiles for First Phase of CIP and Vattenfall’s Zeevonk Project

3 days ago
OSS Zingst jacket foundation at HSM Offshore Energy yard
Manufacturing

Gennaker Offshore Substation Jackets Loaded Out in Netherlands

4 days ago
View of the quayside Rostock plant EEW SPC
Manufacturing

EEW SPC Prepares Rostock Plant for 12-Metre-Diameter Monopiles, Eyes Further Upgrade After 2030

5 days ago
BW Ideol’s Eight-Year-Old Floatgen Turbine Produces 40 GWh
Manufacturing

BW Ideol’s Eight-Year-Old Floatgen Turbine Produces 40 GWh

BW Ideol’s 2 MW Floatgen floating wind turbine has been in operation for eight years at the SEM-REV offshore test site off Le Croisic, France, with cumulative electricity production now exceeding 40 GWh. The turbine, installed on BW Ideol’s concrete Damping Pool floating foundation, entered operatio

23 days ago
JFE Engineering Rolls Out First ‘Made in Japan’ Monopile for Oga–Katagami–Akita Offshore Wind Farm
Manufacturing

JFE Engineering Rolls Out First ‘Made in Japan’ Monopile for Oga–Katagami–Akita Offshore Wind Farm

Tokyo-based JFE Engineering Corporation has produced what it says is Japan’s first domestically manufactured monopile for an offshore wind farm. The monopile is destined for the 315 MW Oga–Katagami–Akita project, owned by a consortium consisting of JERA Nex BP, Electric Power Development (J-POWER),

24 days ago
BRANDED CONTENT
Optimizing Offshore Activity: Modernizing Plate Rolling for Heavy Fabrications
Manufacturing

Optimizing Offshore Activity: Modernizing Plate Rolling for Heavy Fabrications

The offshore sector faces unprecedented demands for scale, volume, and structural integrity. As monopiles, transition pieces, and jacket foundations grow larger (requiring steel plates exceeding 100 mm (3.93 in) in thickness and up to 4.5 m (14.76 ft) in width) fabrication yards must resolve bottlen

about 1 month ago
Haizea Delivers Largest Monopiles Ever Built in Southern Europe for Hornsea 3
Manufacturing

Haizea Delivers Largest Monopiles Ever Built in Southern Europe for Hornsea 3

Haizea Wind Group has delivered what it says are the largest monopiles ever manufactured in Southern Europe for the Hornsea 3 offshore wind farm in the UK. Produced at the company’s facility at the Port of Bilbao, the monopiles measure over 105 metres in length, have a diameter of 11 metres, and wei

about 1 month ago
Steelwind Completes Baltica 2 Monopile Deliveries
Manufacturing

Steelwind Completes Baltica 2 Monopile Deliveries

Steelwind Nordenham has completed the delivery of all monopiles under its contract for the 1.5 GW Baltica 2 offshore wind farm in the Polish Baltic Sea, with the final two foundations shipped from the company’s port facility. Under its scope, Steelwind manufactured and delivered 34 monopiles for the

about 1 month ago
Dajin Starts Fabrication of Transition Pieces for 976 MW Gennaker Offshore Wind Farm
Manufacturing

Dajin Starts Fabrication of Transition Pieces for 976 MW Gennaker Offshore Wind Farm

Dajin Heavy Industry has started fabrication of 63 transition pieces (TPs) for the 976.5 MW Gennaker offshore wind farm in the German Baltic Sea, following a first steel cutting ceremony held at the company’s Penglai manufacturing base in China on 30 July. The transition pieces are being manufacture

about 1 month ago
SK Oceanplant to Build Jacket Foundation for BalWin5 Offshore Converter Platform
Manufacturing

SK Oceanplant to Build Jacket Foundation for BalWin5 Offshore Converter Platform

South Korean offshore wind foundation manufacturer SK oceanplant has secured a contract from Seatrium to manufacture and supply the jacket foundation and piles for TenneT’s BalWin5 high-voltage direct current (HVDC) offshore converter platform in the German North Sea. The contract will see SK oceanp

about 1 month ago
CS Wind Offshore Delivers First Nordlicht I Transition Pieces
Manufacturing

CS Wind Offshore Delivers First Nordlicht I Transition Pieces

CS Wind Offshore has sent off the first batch of transition pieces (TPs) for Vattenfall’s Nordlicht I offshore wind farm from its site at the Port of Aalborg to Germany. Weighing around 362 tonnes each, the transition pieces will be transported and installed at the project site in the German North S

about 1 month ago
PTSC M&C Loads Out Fengmiao Offshore Substation
Manufacturing

PTSC M&C Loads Out Fengmiao Offshore Substation

PTSC Mechanical & Construction (PTSC M&C) has completed the construction and loadout of the offshore substation structures for the Fengmiao offshore wind project in Taiwan, comprising a 3,400-tonne topside and an 8,000-tonne jacket and the accompanying piles. “Delivered on schedule with more than 2.

about 1 month ago
BW Ideol, NGE Partner on Floating Wind Foundation Manufacturing Facility in Southern France
Manufacturing

BW Ideol, NGE Partner on Floating Wind Foundation Manufacturing Facility in Southern France

BW Ideol and French construction group NGE have signed an exclusive partnership agreement to jointly develop the Fos3F floating wind foundation manufacturing project in Fos-sur-Mer. Under the agreement, the two companies will each hold a 50 per cent stake in Fos3F, which aims to establish a serial p

about 1 month ago
  • 1
  • 2
  • …
  • 15