Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Manufacturing

Loading filters...
Business & FinancePorts & LogisticsFoundationsFixed-BottomAuthoritiesContracts & TendersContracts & TendersCablesSupply ChainBusiness developmentPower-to-XVesselsProject UpdatesProject UpdatesOffshore PlatformsGrid ConnectionWind Farm UpdateFloating WindResearch & DevelopmentWind TurbinesIndustry
Haizea Wind Group’s factory in Spain
Manufacturing

US Wind Gives Up Sparrows Point Site as Offshore Wind Project Faces Delays

5 days ago
Tekmar employee in PPE with company logo
Manufacturing

Tekmar Nets EUR 6 Million Contract Extension in Offshore Wind

14 days ago
Subsea Micropiles
Manufacturing

Subsea Micropiles to Invest GBP 5 Million in Expanding Manufacturing, Offshore Ops at Scottish Port

15 days ago
Kristian Borum Jørgensen, CEO at Stillstrom and Stephen Booth VP Renewable Services at Semco Maritime
Manufacturing

Stillstrom Signs Semco Maritime to Build Offshore Charging Equipment

20 days ago
OSS Darß loaded out in Vlissingen
Manufacturing

Gennaker Offshore Substation Topsides Loaded Out Ahead of Sail-Away

22 days ago
Offshore converter platform render - LanWin platform
Manufacturing

Neptun Werft-Smulders Joint Venture Secures Second 2 GW Converter Platform Contract from 50Hertz

25 days ago
Baltica 2 monopiles by EEW SPC
Manufacturing

EEW SPC to Supply TP-Less Monopiles for First Phase of CIP and Vattenfall’s Zeevonk Project

26 days ago
OSS Zingst jacket foundation at HSM Offshore Energy yard
Manufacturing

Gennaker Offshore Substation Jackets Loaded Out in Netherlands

27 days ago
View of the quayside Rostock plant EEW SPC
Manufacturing

EEW SPC Prepares Rostock Plant for 12-Metre-Diameter Monopiles, Eyes Further Upgrade After 2030

28 days ago
BW Ideol’s Eight-Year-Old Floatgen Turbine Produces 40 GWh
Manufacturing

BW Ideol’s Eight-Year-Old Floatgen Turbine Produces 40 GWh

BW Ideol’s 2 MW Floatgen floating wind turbine has been in operation for eight years at the SEM-REV offshore test site off Le Croisic, France, with cumulative electricity production now exceeding 40 GWh. The turbine, installed on BW Ideol’s concrete Damping Pool floating foundation, entered operatio

about 1 month ago
JFE Engineering Rolls Out First ‘Made in Japan’ Monopile for Oga–Katagami–Akita Offshore Wind Farm
Manufacturing

JFE Engineering Rolls Out First ‘Made in Japan’ Monopile for Oga–Katagami–Akita Offshore Wind Farm

Tokyo-based JFE Engineering Corporation has produced what it says is Japan’s first domestically manufactured monopile for an offshore wind farm. The monopile is destined for the 315 MW Oga–Katagami–Akita project, owned by a consortium consisting of JERA Nex BP, Electric Power Development (J-POWER),

about 1 month ago
BRANDED CONTENT
Optimizing Offshore Activity: Modernizing Plate Rolling for Heavy Fabrications
Manufacturing

Optimizing Offshore Activity: Modernizing Plate Rolling for Heavy Fabrications

The offshore sector faces unprecedented demands for scale, volume, and structural integrity. As monopiles, transition pieces, and jacket foundations grow larger (requiring steel plates exceeding 100 mm (3.93 in) in thickness and up to 4.5 m (14.76 ft) in width) fabrication yards must resolve bottlen

about 2 months ago
Haizea Delivers Largest Monopiles Ever Built in Southern Europe for Hornsea 3
Manufacturing

Haizea Delivers Largest Monopiles Ever Built in Southern Europe for Hornsea 3

Haizea Wind Group has delivered what it says are the largest monopiles ever manufactured in Southern Europe for the Hornsea 3 offshore wind farm in the UK. Produced at the company’s facility at the Port of Bilbao, the monopiles measure over 105 metres in length, have a diameter of 11 metres, and wei

about 2 months ago
Steelwind Completes Baltica 2 Monopile Deliveries
Manufacturing

Steelwind Completes Baltica 2 Monopile Deliveries

Steelwind Nordenham has completed the delivery of all monopiles under its contract for the 1.5 GW Baltica 2 offshore wind farm in the Polish Baltic Sea, with the final two foundations shipped from the company’s port facility. Under its scope, Steelwind manufactured and delivered 34 monopiles for the

about 2 months ago
  • 1
  • 2
  • …
  • 15